Payment Terms | T/T, L/C, Western Union |
Supply Ability | 600,000 mt per year |
Delivery Time | 15-30 working days after received your advance payment |
Packaging Details | Standard export packaging like carton / wooden box |
Colour | Silver |
Surface coating | Mill finish or Anodize |
Application | Water cooling, vehicle battery cooling |
Thickness | 1-6mm |
Length | Customized |
Technology | Extrusion or brazed |
Width | Customized |
Product name | New Energy Vehicle Battery Cooling Aluminum Cooling Plate |
MOQ | 1pc |
Brand Name | Trumony |
Certification | TS16949 , ISO14001 |
Place of Origin | China |
View Detail Information
Explore similar products
FSW Brazed Welding Cold Plate For Truck Battery Cooling System
Aluminum Liquid Cooling Unit For Battery Energy Storage System (BESS) Rack
H112 Serpentine 3003 Aluminum Plate For Vehicle Battery Cooling
3003 Aluminum 1186x685mm Water Cooling Plate For Heat Exchanger
Product Specification
Payment Terms | T/T, L/C, Western Union | Supply Ability | 600,000 mt per year |
Delivery Time | 15-30 working days after received your advance payment | Packaging Details | Standard export packaging like carton / wooden box |
Colour | Silver | Surface coating | Mill finish or Anodize |
Application | Water cooling, vehicle battery cooling | Thickness | 1-6mm |
Length | Customized | Technology | Extrusion or brazed |
Width | Customized | Product name | New Energy Vehicle Battery Cooling Aluminum Cooling Plate |
MOQ | 1pc | Brand Name | Trumony |
Certification | TS16949 , ISO14001 | Place of Origin | China |
High Light | 6mm Aluminum Cold Plate ,Brazed Aluminum Cold Plate ,Brazed Aluminum Cooling Plate |
New Energy Vehicle Battery Cooling Aluminum Cooling Plate
1. Description of Aluminum Cooling Plate
Production Process: Cold stamping - cleaning - spray flux - fixture clamp the product into the brazing furnace - brazing furnace after more than a dozen procedures (like automatic heating/ insulation/ cooling/ welding etc.) - do full inspection of air tightness test - cleaning (mainly for welding cleaning, polishing, drying) etc, which is total more than 20 steps procedures.
1) Cladding Material of aluminum alloy
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
3003 | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.1 | 0.05 | 0.03 | 1 |
3003+1%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.5-1.50 | 0.05 | 0.05 | 2 |
3003+1.5%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 1.0-2.0 | 0.05 | 0.05 | 3 |
3003+1.5%Zn+Zr | 0.5-1.0 | 0.7 | 0.05-0.20 | 1.0-1.6 | - | 1.0-2.0 | 0.05-0.2 | - | 4 |
3003+0.5%Cu | 0.6 | 0.7 | 0.30-0.70 | 1.0-1.5 | - | 0.10 | 0.05 | 0.1 | 5 |
3005 | 0.6 | 0.7 | 0.20-0.40 | 1.0-1.5 | 0.20-0.60 | 0.25 | - | 0.01 | 6 |
2) Core Material
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
4343 | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.2 | - | 0.05 | 1 |
4343+1%Zn | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.5-1.5 | - | 0.05 | 2 |
4045 | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.2 | - | 0.2 | 3 |
4045+1%Zn | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.5-1.5 | - | 0.2 | 4 |
4004 | 9.0-10.5 | 0.8 | 0.25 | 0.1 | 1.0-2.0 | 0.2 | - | 0.2 | 5 |
3) Main mechanical of aluminum for welding heat exchanger system
Alloy Code | temper | Tensile Strength Rm(MPa) | Yield Strength Rp0.2(Mpa) | Extend Ratio A50(%) |
TR-010,TR-020,TR-030,TR-040,TR-050,TR-110,TR-310,TR-116,TR-316,TR-111,TR-313,TR-121,TR-131,TR-141,TR-150,TR-151,TR-156 Etc. | O | 95-135* | ≥35* | ≥15* |
H14 | 140-185 | ≥125 | ≥1.5 | |
H24 | 140-185 | ≥125 | ≥3.0 | |
H16 | 185-225 | ≥160 | ≥1.0 | |
H18 | ≥185 | - | ≥0.5 | |
TR-166 Etc.plate material | H24 | 185-235 | ≥150 | ≥8 |
TR-116,TR-316 Etc.plate material | H14 | 140-185 | ≥125 | ≥3 |
H24 | 140-185 | ≥125 | ≥8 |
2.Our advantages of 3003 Brazing New design aluminum ev cooling plate for battery cold:
1). From 2006, we have rich experience in this aluminum heat exchange area in China;
2). Good reputation in aluminum industry;
3). We have design teams to achieve your design idea and can give you professional suggestions;
4). Good price for bulk order;
5). Good experience cooperation with big clients in the world;
6). With Certificate like ISO9001-2008;
7). Sample order can accept;
8). High performance cost ratio;
9). Fast delivery time and resolve problem attitude.
3. Terms and conditions:
1), Trade terms: CIF / CFR / FOB/ EXW
2), Payment: TT 30% before production + 70% before shipment or against copy of BL;
or 100% Irrevocable L/C at sight etc.
3), Production time: Normally it is about 10-30 days.
4. FAQ:
Q: Are you a trading company or manufacturer?
A:Yes,we are a factory with more than 10 years history in this industry.
Q: What is your terms of payment ?
A: Normally 30% TT in advance, balance paid before shipment.
Q: How long does it take for samples and mass production?
A: Usually it will take 15-20 days for new moulds and free samples (within 5 kg),;
after confirmation, 25-30 days for mass production.
Q:OEM/ODM available?
A:Yes,we can!
Q:Could you provide sample?
A:Yes, We are honored to offer you samples for quality check.
Q:Is sample order accepted?
A:Yes,we accept sample order and we can provide design service!
Company Details
Business Type:
Manufacturer
Year Established:
2006
Total Annual:
100000000-150000000
Employee Number:
300~500
Ecer Certification:
Site Member
Trumony Group was established in 2007. With more than 10 years development , now Trumony is national high-tech enterprise . specialized in production of battery thermal management components , thermal interface material , aluminum brazing material and extruded profile. Trumony group hea... Trumony Group was established in 2007. With more than 10 years development , now Trumony is national high-tech enterprise . specialized in production of battery thermal management components , thermal interface material , aluminum brazing material and extruded profile. Trumony group hea...
Get in touch with us
Leave a Message, we will call you back quickly!