Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days |
Packaging Details | Seaworthy packing |
Material | Carbon Steel,Alloy,Stainless steel |
Surface treatment | Painted |
HS Code | 3215960855 |
Packaging | Iron Frame Packing |
Available | Energy Saving |
Color | Red / Grey Other Color |
Condition | New |
Specification | Customized |
Brand Name | HD BOILER |
Model Number | superheater |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | China |
View Detail Information
Explore similar products
Thermal Power SA213 T11 Alloy Steel Radiant Superheater International Standard
ASME Standard Alloy Steel Superheater Coil For Coal Power Plants
Eco Friendly High Pressure Superheater And Reheater Thicker Stainless Steel For
Painted Stainless Steel Horizontal Superheater And Reheater Inverted
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days | Packaging Details | Seaworthy packing |
Material | Carbon Steel,Alloy,Stainless steel | Surface treatment | Painted |
HS Code | 3215960855 | Packaging | Iron Frame Packing |
Available | Energy Saving | Color | Red / Grey Other Color |
Condition | New | Specification | Customized |
Brand Name | HD BOILER | Model Number | superheater |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | China |
High Light | Carbon Steel convection superheater ,ASME convection superheater ,Biomass Superheater Coil |
HD Boiler Co.,ltd Carbon Steel Waste Incineration Superheater Coil Coal Biomass Boiler Convection Superheater
Product Description
The wall superheater is a special class of superheater. Sometimes part of the superheating surface needs to be located at the furnace proper. The wall superheater surface is used in these applications. A wall superheater is basically a flat panel of joined tubes that hangs either as close to the furnace membrane wall as possible or forms part of the furnace. Sometimes the backpass side walls form a superheating surface. Typically wall superheaters are the first superheater after the steam drum or the coolest superheater.
Specification
|
Functions
This superheater has two parts, the primary superheater and the secondary heater. The primary superheater is the first heater that is passed by steam after the steam comes out of the steam drum.
After the steam is heated on the super primary heater, eating steam will be passed on the secondary superheater to be heated again. So on the secondary superheater steam formed is the hottest steam among the others.
Steam from the secondary superheater which becomes superheated steam. SH steam will flow to rotate High-Pressure Turbine and then the pressure and temperature will drop.
Certification
Quality Control
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
Company
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!