China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation
China IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation

  1. China IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation
  2. China IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation
  3. China IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation
  4. China IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation

IBR Submerged Arc Welding CS Boiler Water Cooling Panel Heat Radiation

  1. MOQ: 5 tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 800 Tons / Month
Delivery Time 30 Days
Packaging Details Iron Frame Package
Name Boiler Water Walls
Application Boiler System
Material Carbon Steel
Color Customer's Requirement
Standard ASME, EN, GB, IBR
Welding Way Submerged Arc Welding
Brand Name HD BOILER
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 800 Tons / Month
Delivery Time 30 Days Packaging Details Iron Frame Package
Name Boiler Water Walls Application Boiler System
Material Carbon Steel Color Customer's Requirement
Standard ASME, EN, GB, IBR Welding Way Submerged Arc Welding
Brand Name HD BOILER Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China
High Light IBR water cooling panelSubmerged Arc Welding boiler panelCS boiler water cooling panel

Nose Arch Water Wall Panels in ASME/Chinese Standard For Utility Boilers​

 

Introduction

Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 

HDB provides replacement boiler water walls, burner openings, inspection ports and doors for utility and industrial boilers. Recently completed projects include rear and sidewall replacement as part of a complete reheater replacement and the studded burner throat with bifurcated tubes pictured to the right. Inspection ports, camera ports, and access doors of any brand are also available.

 

 

 

 

Application

 

The water wall is the main radiation heat surface, arranged inside the boiler chamber and proceeds the heat exchange directly with the high temperature flame. The convection tubes are the convection heat surface of the boiler, arranged between the boiler chamber outlet and the end surface and proceed the heat exchange directly with the high temperature fume.

 

Description

 

1 Water wall panels are used in Waste Heat recovery boilers. We manufacture Water wall panels. These are fabricated out of carbon steel tubes to customers' drawings and specifications. Special care is taken for ovality and thinning at the bent portion, during fabrication.
2 We are manufacturing and supplying a comprehensive range of Waterwall Panels. The tubes offered by us are known to withstand a great internal pressure as a continual strip of fin material is wound spirally on the tube. These tubes are known to provide heat uniformly that result in an increased heat output.
3 The main function of water wall panels in boiler is to absorb the heat generated by high temperature flame or flue and to generate steam or hot water in tubes, hence to reduce the temperature in the chamber.

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement