Payment Terms | L/C, , T/T, , Western Union |
Supply Ability | 500 Tons Per Month |
Delivery Time | 50-100 days |
Packaging Details | Iron Frame Packing |
Application | Power Plant Boiler |
Pressure | High Pressure |
Range of Applications | Power station , Industrial |
Specification | Customized |
Surface Treat | Painted |
Size | Customized |
Function | Heat Exchanger |
Material | Carbon Steel / Stainless Steel |
Brand Name | HD BOILER |
Model Number | Spiral Fin Tube |
Certification | ISO9001 , SGS , ASME , EN , TUV |
Place of Origin | ZhangJiagang , Jiangsu , China |
View Detail Information
Explore similar products
Cold Finish High Frequency Welding ASME Boiler Fin Tube
Customized Industrial Boiler Fin Tube , Economizer H Fin Tubes For Heat
Customized Carbon Steel Spiral Boiler Spare Parts Fin Tube For Industry
ISO Certification Boiler Tubular Longitudinal Fin Tube For Heat Exchange
Product Specification
Payment Terms | L/C, , T/T, , Western Union | Supply Ability | 500 Tons Per Month |
Delivery Time | 50-100 days | Packaging Details | Iron Frame Packing |
Application | Power Plant Boiler | Pressure | High Pressure |
Range of Applications | Power station , Industrial | Specification | Customized |
Surface Treat | Painted | Size | Customized |
Function | Heat Exchanger | Material | Carbon Steel / Stainless Steel |
Brand Name | HD BOILER | Model Number | Spiral Fin Tube |
Certification | ISO9001 , SGS , ASME , EN , TUV | Place of Origin | ZhangJiagang , Jiangsu , China |
High Light | spiral fin tube ,heat exchanger fin tube |
Carbon Steel Compact Structure Heat Exchanger Fin Tube For Power Plant Economizer
Specifications
In order to ensure that these units met customer expectations, a series of in-process testing was performed in accordance with Fin Tube Products' quality control system. In addition, the products' quality was also verified by an onsite independent testing company.
Base Tube Material | Stainless Steel, Carbon Steel, Alloy Steel, Copper Alloy,Aluminum ,SA179 | ||
Fin Material | Aluminum, Copper Alloy, Stainless Steel, Carbon Steel | ||
Standard | ASME SA213/ASTM; ASME EA 106, ASME SA178, ASTM B1111 | ||
Fin depth | 0.5-3mm | ||
Base pipe O.D | 12.7-18mm | ||
Fins per inch | 8-20Nos (as customer's request) | ||
Test Requirement | Physical Property Test, Chemical Composition Analysis, Non-Destructive Test, Other Inspection and Test as customer's requirement. | ||
Application | Air Cooler, Charge Air Chiller, Condenser, Evaporator, Fluid Cooler, Gas Cooler, Oil Cooler, Radiator, Refrigeration, Steam to Air Heat Exchange, super heater etc. |
Product Description
Fin tubes have played an important part in power plant boilers .
Fin Tube,Extruded Fin tube,Welding Fin tube,L/LH Type Fin Tube,H Type Fin tube with Material A179/Alu1060,stainless steel,copper,copper nickel
Technical parameters | The high degree of fin 0-16mm(or outside diameter of fin φ25-φ75); Pitch of fins 2.0-5.0mm; Length of finning tube 0.5~ 14m. |
Single metal rolling finning tube | Pure aluminum 1060 or aluminum alloy 6063,6061. Outside diameter Shall be less than 40mm |
Double metal rolling finning tube | Tube-based protection from the outer layer of aluminum tubes,corrosion-resistant,Tube-based can be made of carbon steel pipe,in addition to,stainless steel tube and copper tube can also be used, as well as titanium alloy tube |
Package | The aluminum finned tubes are well packed in plastic film in the inner and steel fram in the outer |
Company Information
HD Boiler established in 1985, Zhangjiagang Hua Dong Boiler Co., Ltd. (trading as HD Boiler), is a professional industrial manufacturer, producing utility boiler,industrial boiler,HRSG boiler and all kinds of boiler parts, such as waterwall panels, economizers, air preheaters, superheaters, headers, spiral fin tubes, H-fin tubes, heat pipes etc. HD Boiler is located in Dong Lai Industrial Park, east suburb of Zhang Jia Gang City. The plant’s location is around 150km Expressway to Shanghai Port or 60km State Road to Suzhou or Wuxi, with transportation extending in all directions conveniently and quickly.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!