Payment Terms | L/C, T/T |
Supply Ability | 500 tons/month |
Delivery Time | 30 working days |
Packaging Details | Seaworthy Packing |
Type | Economizer |
Application | power plant/WTE/waste incineration |
Output | Hot Water/Steam |
Fuels | Coal;Oil;Biomass |
Material | Carbon steel |
Standard | ASME&GB |
Brand Name | HDB |
Model Number | Boiler Economizer |
Certification | ASME,EN,ISO,SGS |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Power Station / Power Plant Serpentine Tube for Hot Water/Steam Output Steam
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 500 tons/month |
Delivery Time | 30 working days | Packaging Details | Seaworthy Packing |
Type | Economizer | Application | power plant/WTE/waste incineration |
Output | Hot Water/Steam | Fuels | Coal;Oil;Biomass |
Material | Carbon steel | Standard | ASME&GB |
Brand Name | HDB | Model Number | Boiler Economizer |
Certification | ASME,EN,ISO,SGS | Place of Origin | CHINA |
High Light | Soot Blowing Power Plant Economizer ,Power Plant Economizer ,Spiral Fin Tube Economizer |
Power Plant Economizer with Spiral Fin Tube Reduced Wear Improved Soot Blowing
Where is the economizer located in a boiler system?
Between the boiler's last heat trap and the air preheater.
Economizer Description
H-type finned tube economizer is an efficient heat transfer economizer assembled by h-type finned tube (also called H-type finned tube, finned tube, butterfly tube).
Function
1. Absorb the heat of low-temperature flue gas, reduce the smoke exhaust temperature, reduce smoke loss and save fuel.
2. Since the feed water is heated in the economizer before entering the drum, the heat absorption of the feed water on the heating surface is reduced, and the economizer can be used to replace part of the high-cost evaporative heating surface.
3. When the feed water temperature is raised, the wall temperature difference will be reduced and the thermal stress will be correspondingly reduced to extend the service life of the steam drum.
Specification
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process: | EF+LF + VD |
Process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection |
UT standard | ASTM A388 or EN10228, etc |
Application
Related Industry: Combined cycle power plant,Heat recovery steam generator(HRSG).
Economizers are commonly used as part of a heat recovery steam generator (HRSG) in a combined cycle power plant. In an HRSG, water passes through an economizer, then a boiler and then a superheater. The economizer also prevents flooding of the boiler with liquid water that is too cold to be boiled given the flow rates and design of the boiler.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!