Payment Terms | L/C,T/T,Western Union |
Supply Ability | 500 tons per month |
Delivery Time | 60~80 days |
Packaging Details | Seaworthy packing |
Porduct Name | Boiler Economizer Coils |
Dimension of Tube | OD32mm*Thickness4mm |
Material of Base Tube | SA210C |
Keyword | Boiler Economizer |
Production Technique | Tube Bending, Assembly |
Packing | Steel Frame |
Brand Name | HDB |
Model Number | Boiler Economizer |
Certification | ASME, EN, ISO9001, SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Power Station / Power Plant Serpentine Tube for Hot Water/Steam Output Steam
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Product Specification
Payment Terms | L/C,T/T,Western Union | Supply Ability | 500 tons per month |
Delivery Time | 60~80 days | Packaging Details | Seaworthy packing |
Porduct Name | Boiler Economizer Coils | Dimension of Tube | OD32mm*Thickness4mm |
Material of Base Tube | SA210C | Keyword | Boiler Economizer |
Production Technique | Tube Bending, Assembly | Packing | Steel Frame |
Brand Name | HDB | Model Number | Boiler Economizer |
Certification | ASME, EN, ISO9001, SGS | Place of Origin | China |
High Light | ASME Standard Boiler Economizer Coils ,Carbon Steel Boiler Economizer Coils ,Shields Boiler Economizer Coils |
ASME Standard Boiler Economizer Coils Made Of Carbon Steel With Shields and Handcuffs
Product Introdution
Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.
The tubular economizer consists of a series of parallel serpentine tubes, which are made of seamless steel pipes with an outer diameter of 25 ~ 42 mm, and the pipes are usually arranged in a staggered arrangement.
Working Process of Boiler Economizer
There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).
Parameters of Boiler Economizer
Description | Boiler economizer |
Material of Base Tube | SA210A1 |
Material standard | ASTM |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Process | Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
Company Profile
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from
design, manufacturing to installation and maintenance.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!