China factories

China factory - KELI MACHINE Co,. Ltd

KELI MACHINE Co,. Ltd

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 25-50T/H Hollow Clay Brick Making Machine Hammer Mill Crusher For Clay Brick
China 25-50T/H Hollow Clay Brick Making Machine Hammer Mill Crusher For Clay Brick

  1. China 25-50T/H Hollow Clay Brick Making Machine Hammer Mill Crusher For Clay Brick
  2. China 25-50T/H Hollow Clay Brick Making Machine Hammer Mill Crusher For Clay Brick

25-50T/H Hollow Clay Brick Making Machine Hammer Mill Crusher For Clay Brick

  1. MOQ: 1set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 100sets/month.
Delivery Time 15-35days
Packaging Details Container
Dimensions 1600*1390*1575mm
Type Mill Crusher for Clay Brick Making
Discharge particle size 35mm
Feed particle size 350mm
Brand Keli
Application Brick Making
Voltage 220v 380v 415v
customization OEM ODM
Brand Name KELI
Model Number PC1000x800
Certification ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 100sets/month.
Delivery Time 15-35days Packaging Details Container
Dimensions 1600*1390*1575mm Type Mill Crusher for Clay Brick Making
Discharge particle size 35mm Feed particle size 350mm
Brand Keli Application Brick Making
Voltage 220v 380v 415v customization OEM ODM
Brand Name KELI Model Number PC1000x800
Certification ISO9001 Place of Origin China
High Light 25t/h hollow clay brick making machine50t/h hollow clay brick making machine350mm clay making machine

Hammer Mill Crusher for Clay Brick Making 25-50T/H Productivity

 

Model   PC300x200 PC400x300 PC600x400 PC800x600 PC1000x800 PC1000x1000
Feed particle size mm 100 200 250 250 350 350
Discharge particle size mm 8 25 30 35 35 35
Productivity t/h 1-5 5-10 10-22 18-40 25-50 30-55
Number of motor poles   4 4 4 4 4 6
Power kw 5.5 11 11-22 30-55 75 90
Dimensions mm

630*380

*630

900*670

*860

1200*1050

*1200

1310*1180

*1310

1600*1390

*1575

1800*1590

*1775

Machine weight kg 200 800 1500 3200 4300 8000

 

Product Show

 

Precautions

In addition to the general requirements for the installation, use and maintenance of hammer crushers, the following points must be emphasized here:

(1) The hammer crusher is designed to break materials by means of a high-speed rotating hammer head. Therefore, the installation of the foundation and the rotating shaft must be strictly horizontal, with an error of not more than 0.5/1000mm longitudinally and 0.1/1000mm axially.

(2) The gap between the hammer head and the grate of the hammer crusher can be adjusted by the two eccentric wheels on the lower part of the grate according to the crushing size requirement. The gap adjustment requirement: when the material crushing size is 5mm, the gap between the hammer head and the grate bar can be adjusted to 10~15mm; when the crushing size is 10mm, the gap can be adjusted to between 15~25mm. The clearance of the grate itself can also be adjusted by adding or subtracting shims within a certain range as required by the crushing size.

(3) During the use of the hammer crusher, the liner plate, hammer head and grate bar should be checked regularly for wear and tear. If necessary, they should be replaced in time. After the hammer head is worn, it can be repaired by alloy welding rod and continue to use, but the welding should be symmetrical and balanced, otherwise it will cause the equipment to run unbalanced and lead to violent vibration.

(4) Hammer head replacement must be replaced in pairs according to the relative position, otherwise it will cause unbalance of rotor rotation.

(5) The maximum temperature of the rotor bearing must not exceed 70°C. If it exceeds 70°C, the machine should be stopped immediately for inspection and treatment.

(6) If the bearing housing is lubricated with thin oil, the bearing should be lubricated once after every 8h of work. The height of the oil surface should be maintained in the centre of the lowest one ball, and the lubricant should be replaced once every 3 months. If it is dry oil lubrication, the dry oil cup gland should be screwed 2~3 times per shift, adding a certain amount of dry oil, and the bearing should be cleaned once every 6 months.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2006

  • Total Annual:

    500000-600000

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

Yixing Keli Machine Co, Ltd was founded in 2006, it is a machinery manufacturing enterprise which grates professional research and development, production and marketing as a whole. The company is located in Yixing city in Jiangsu province which enjoys a high reputation of "bright pearl of ceram... Yixing Keli Machine Co, Ltd was founded in 2006, it is a machinery manufacturing enterprise which grates professional research and development, production and marketing as a whole. The company is located in Yixing city in Jiangsu province which enjoys a high reputation of "bright pearl of ceram...

+ Read More

Get in touch with us

  • Reach Us
  • KELI MACHINE Co,. Ltd
  • Qianluo Industrial park, Dingshan, Yixing, Jiangsu, China
  • https://www.brick-makingmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement