Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 tons per month |
Delivery Time | 10-90 work days |
Packaging Details | PLY-WOODEN CASE OR PALLET |
Type | Seamless/Welded |
Material | ss 201/304/316 |
Technique | Efw, Hot Rolled, Hot rolled, Welded, Galvanized |
Surface | Polishing or Unpolishing |
Thickness | 0.01mm-4mm |
Processing Service | Welding, Cutting |
Standard | DIN, ASTM, JIS, DIN 1626, ASTM A106-2006, JIS G3463-2006 |
Application | Chemical Industry, Construction, Building |
Brand Name | TOBO/TPCO/TISCO/VALIN/METAL |
Model Number | Duplex Stainless Steel Pipe |
Certification | ISO/PED/TUV/SGS/LR/BV |
Place of Origin | China/Japan/Germany |
View Detail Information
Explore similar products
Hot Dip GI Construction Scaffolding Round Welded Pre Galvanized Steel Pipe
Nickel Alloy Inconel 600 601 625 718 825 Monel K-500 Alloy Steel Plate Seamless
Prime Stainless Steel 309S 310S 321 347H Pipe Price Made In China
Oxidizing Resistance Stainless Steel Pipe Reducer Hastelloy C22 UNS N06022
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 tons per month |
Delivery Time | 10-90 work days | Packaging Details | PLY-WOODEN CASE OR PALLET |
Type | Seamless/Welded | Material | ss 201/304/316 |
Technique | Efw, Hot Rolled, Hot rolled, Welded, Galvanized | Surface | Polishing or Unpolishing |
Thickness | 0.01mm-4mm | Processing Service | Welding, Cutting |
Standard | DIN, ASTM, JIS, DIN 1626, ASTM A106-2006, JIS G3463-2006 | Application | Chemical Industry, Construction, Building |
Brand Name | TOBO/TPCO/TISCO/VALIN/METAL | Model Number | Duplex Stainless Steel Pipe |
Certification | ISO/PED/TUV/SGS/LR/BV | Place of Origin | China/Japan/Germany |
High Light | Buttweld Stainless Steel Seamless Pipe ,JIS Schedule 40 Stainless Steel Pipe ,S31803 Stainless Steel Seamless Pip |
ASTM Mirror Polish Seamless tube pipe Square Hot rolled stainless steel 2" STD 316L
Standard | ASTM B165 , ASTM B163 , ASTM B829 , ASTM B775 ,ASTM B725 ,ASTM B730 , ASTM B751,ASTM B 444, ASME SB444, |
Size | 1/2’’~48’’(Seamless);16’’~72’’(Welded) |
Wall thickness | SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS |
Manufacturing process | Push, Press, Forge, Cast, etc. |
Material | Carbon steel, stainless steel, alloy steel, duplex stainless, nickel alloy steel |
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.
FAQ:
We are manufacturer with over years experiences.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!