China 30000 gallon above ground storage tanks , crude oil storage tank
China 30000 gallon above ground storage tanks , crude oil storage tank

  1. China 30000 gallon above ground storage tanks , crude oil storage tank
  2. China 30000 gallon above ground storage tanks , crude oil storage tank

30000 gallon above ground storage tanks , crude oil storage tank

  1. MOQ: 1set
  2. Price: $5000~$20000 one set
  3. Get Latest Price
Supply Ability 60 sets per month
Delivery Time 0-60 days after deposit received
Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden box
Coating color Dark green / can be customized
Coating thickness 0.25mm~0.40mm & Double coating
Adhesion 3,450N/cm
Elastic Same as steel sheet ,around 500KN /mm
Holiday test >1500v
Permeability Gas and liquid impermeable
Payment Terms L/C, T/T
Brand Name CEC TANKS
Model Number W20160127007
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 60 sets per month Delivery Time 0-60 days after deposit received
Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden box Coating color Dark green / can be customized
Coating thickness 0.25mm~0.40mm & Double coating Adhesion 3,450N/cm
Elastic Same as steel sheet ,around 500KN /mm Holiday test >1500v
Permeability Gas and liquid impermeable Payment Terms L/C, T/T
Brand Name CEC TANKS Model Number W20160127007
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Place of Origin China
High Light liquid fertilizer storage tankschemical storage tank

Above Ground With High Acid And Alkali Resistance Glass Lined Liquid Storage Tank

 

 

How is the production process of GFS tank ?

1. Get raw steel sheet : First measure the thickness with micrometer and see whether it matches the raw steel sheet to be used . Then mark down the batch number .

2. Punching , corner cut and edging : Before punching set all the dates as per drawing in the computer and then put steel sheet on the automatic laser cutting machine , which will cutting the holes according to the setting datas .

3. Press Arc :According to the diameter , determine the radian of the pressure plate ; clean up the pressure machine and the plate surface ; be careful do not press the steel emery onto the plate .

4. Short blasting : Before the blasting , shifting the steel emery ( steel grit) and add it to the blasting machine ; hoist the rough steel into the blasting machine. 

5. Glaze Mortar Adjustment : Firstly , the ground coat glaze mortar must be shifted . Secondly , adjust the glaze mortar according to the specification .

6. Spray : Before the spray , check the plate is clean and no defects , use sandpaper to clean the surface well and then put them into the automatic spray machine , start spraying .

7. Buring : After finish spray put the steel sheet to the high temperature oven , the burning temperature between ground enamel and top enamel are different . The temperature of ground enamel is 880-900 degree and the buring time is about 8-20 minutes , while the top ground the temperature is 780-820 degree and the burning time is about 6-16 minutes .

9. Production QC : chemical elements inspection ; holiday test ; Coating  thickness gauge ; Out appearance checking ; Anti-acid&alkaline test ; Anti-high temperature test ; Adhesion test ; Adhesion test

10. Package : Double checking is required before packaging, confirm the plate’s code and quality . The steel plates is separated with each other by PE foam , to avoid any damage on the coating surface . And the whole pallet steels are covered by a outer film, tied by steel belt .

 

Advatanges of GFS tank

1.  superior performance in corrosion resistance and against rust

2.  factory fabrication tank . No painting or spray on erection site

3.  minimal maintenance cost

4.  No need crane or other large equipment during erection.

5.  not subjected to severe weather and environment

6.  can be designed to future expansion, dismantle or re-movement.

 

Comparation of various tanks

No

Item

Cement tank

Carbon steel tank

Enamel tank

1

Construction time

>90 day

> 60 days

<15 days

2

Process technology demand

strict

Welding difficult

easy

3

Installation technology demand

Strict & complicated

difficult

Convenient & easy

4

Removal

impossible

difficult

easy

5

Appearance

normal

normal

good

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1989

  • Employee Number:

    500~600

  • Ecer Certification:

    Verified Supplier

  Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 1989. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...   Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 1989. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...

+ Read More

Get in touch with us

  • Reach Us
  • Shijiazhuang Zhengzhong Technology Co., Ltd
  • Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
  • https://www.cectanks.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement