Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | 50000pcs/mouth |
Delivery Time | 20~30days |
Packaging Details | / |
Product name | Forged tie nut |
Material | Q235/Q245 |
Plate diameter | 100mm |
Surface | Galvanized |
Weight | 0.8kg |
Type | Heavy duty |
Color | Silver/Customized |
Usage | Construction |
Brand Name | MF |
Model Number | D17 |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
International Construction Formwork Accessories ,Galvanized Formwork Tie Swivel
Plastic Concrete Construction Formwork Accessories Injection Molding Formwork
Ductil Cast Iron Formwork Clamp 110 * 5mm Size High Strength Lightweight
Galvanized Casting Construction Formwork Accessories Anchor Wing Heavy Duty Nut
Product Specification
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram | Supply Ability | 50000pcs/mouth |
Delivery Time | 20~30days | Packaging Details | / |
Product name | Forged tie nut | Material | Q235/Q245 |
Plate diameter | 100mm | Surface | Galvanized |
Weight | 0.8kg | Type | Heavy duty |
Color | Silver/Customized | Usage | Construction |
Brand Name | MF | Model Number | D17 |
Certification | ISO | Place of Origin | China |
High Light | Forged Formwork Tie Nut ,D17 Formwork Tie Nut ,Two Wings Formwork Tie Nut |
D17 Scaffold Forged Formwork Tie Nut
Our tension nuts are cast type and have a very high breaking load of over 140 KN, our nut is widely used in formwork systems.
Formwork nut is an important accessory in pouring shear wall engineering. Together with the tie rods, they act as a wall tie rod system, holding the formwork slabs firmly during the concrete pouring process. They can also be used for stationary purposes for other purposes. We have Wing Nuts, Swivel Nuts/Combination Nuts, Anchor Nuts, Wall Plates with Nuts.
There are different sizes and weights, we can also make according to your drawings or samples.
We also supply graphic design, 3D model design service to our customer. Makes your construction more safety, more efficiency.
D17 Scaffold Forged Formwork Tie Nut
1. Sample policy: Free sample available.
2. MOQ: 1000 pcs.
3. OEM construction products are possible.
4. Lead time: 15-25 days after the deposit. For special finished and type, 30-35 days.
5. Payment term: T/T, L/C, Western Union, Paypal.
6. OEM service: customized logo, type, finished, package.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2012
Total Annual:
5000000-8000000
Employee Number:
25~50
Ecer Certification:
Verified Supplier
Zhengzhou Duorui Enterprise Co., Ltd was established in 2012, after 12 years development, our products have evolved and expanded in reinforcement and formwork accessories, like tie rod, wing nut, water stopper, prop sleeve, pin, scaffolding coupler etc. and plastic building materials, such as d... Zhengzhou Duorui Enterprise Co., Ltd was established in 2012, after 12 years development, our products have evolved and expanded in reinforcement and formwork accessories, like tie rod, wing nut, water stopper, prop sleeve, pin, scaffolding coupler etc. and plastic building materials, such as d...
Get in touch with us
Leave a Message, we will call you back quickly!