Payment Terms | L/C,T/T |
Supply Ability | 200, 000 Tons / Year |
Delivery Time | 3-5weeks |
Packaging Details | Single package size: 1200 × 200 × 200 cm |
Crane | Optional |
Door | Sliding Door or Roller Shutter |
Strength | Strong |
Fire Resistance | High |
Structure | Steel Structure |
Kneebrace | Angle Steel |
Load Capacity | Depends on design |
Configuration | Steel column |
Brand Name | CT Steel Structure |
Model Number | Workshop86702 |
Certification | SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Customized Design Multi Storey Pre Engineered Steel Structure Workshop
Factory Prefabricated H-shaped Steel Structure Metal Frame Building Industrial
High-strength Steel Structure Factory Building Galvanized H-shaped
Customizable Color Large Span Steel Workshop Lightweight For Optimal Production
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 200, 000 Tons / Year |
Delivery Time | 3-5weeks | Packaging Details | Single package size: 1200 × 200 × 200 cm |
Crane | Optional | Door | Sliding Door or Roller Shutter |
Strength | Strong | Fire Resistance | High |
Structure | Steel Structure | Kneebrace | Angle Steel |
Load Capacity | Depends on design | Configuration | Steel column |
Brand Name | CT Steel Structure | Model Number | Workshop86702 |
Certification | SGS | Place of Origin | China |
High Light | custom steel structure workshop ,large span industrial building ,steel factory workshop construction |
Large span production space customized steel structure industrial building factory workshop
Steel structure factory buildings are industrial workshops with steel as the main load-bearing structure, where the main frame is connected by components such as steel columns and. The roof and walls mostly use lightweight materials such as color steel plates, which have the characteristics of large span, good seismic performance, short construction period, and high space utilization. can flexibly meet the installation of large equipment, material stacking, and production process needs, and are also convenient for later expansion and reconstruction. They are common efficient and practical building forms modern industrial buildings.
Product name | Steel structure factory |
Length | H beam 4000-15000mm |
Height | 200-1200mm |
Galvanizing Thickness | 40 - 100 μm, etc. for Selection. |
Main frame | H beam |
Base | Cement and steel fouddation bolts |
Specification | Custom |
Bolt | Plain bolt ang high-strenth bolt |
Roof&wall | Sandwich panel or color plate |
Door | Sliding or rolling door |
Transport Package | Seaworthy Package |
Trademark | Qianfeng Chentai Steel Structure |
Customized design is welcomed. | |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. | |
Building Purpose: we will recommend the best design for the purpose of the building | |
A.Warehouse/Storage | |
B.Industrial workshops | |
C.Processing plants | |
D.Greenhouse structure for breeding | |
E.Medical Warehouse | |
F.Office buildings | |
G.Agriculture Barn |
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Steel structure factory building
1. Robust and durable structure, suitable for heavy industrial load requirements
The steel structure workshop uses high-strength as the core load-bearing component, with superior tensile and flexural properties, far exceeding traditional masonry structures. It can easily support heavy industrial equipment such as 1-30 tons of heavy machine tools and cranes, while withstanding strong winds above level 8, earthquakes above magnitude 7, and heavy snow loads. It is suitable the use scenarios of long-term and high-frequency operations in factories. Moreover, the components are treated with shot blasting rust removal anti-corrosion coating, which effectively isolate the workshop from oil and dust erosion, greatly reduce rust, cracking and other issues, and have a service life of more than 40 years, far exceeding the average span of traditional factory buildings of 20-30 years, reducing the long-term reconstruction cost.
2. Flexible and open space, meeting diversified production layoutDependent on the large span characteristics of steel structures, the factory can achieve a column-free design of 20-50 meters, with a reasonable column spacing of -12 meters, completely getting rid of the space constraints of load-bearing walls in traditional factory buildings. The internal space does not require additional supporting components, which can provide sufficient for production line planning, and can also adjust the partition according to production needs at any time, or even add 2-3 layers of steel structure mezzanine floors according needs, further expanding the usable area, and meeting the spatial needs of different types of factory buildings such as mechanical processing, warehousing and logistics, and heavy manufacturing.
3 Efficient and rapid construction, shortening the investment cycle
The steel structure workshop adopts a construction mode of "factory prefabrication on-site assembly". The beams, purlins, steel columns and other components are produced in the factory through numerical control cutting and automated welding, with stable and controllable quality; only bolted connection and are needed on site, without the need for a large amount of wet work as in traditional factory buildings, and it is less affected by weather such as rain and winter low temperatures.4. Low operation and maintenance costs, easy for later transformation
In daily operation and maintenance, the connection of steel structure workshop components is clear, and the inspection points are clear, there is no need to check by chiseling walls as in masonry factory buildings, but only need to regularly carry out simple maintenance on the bolt joints and anti-corion coatings, and the annual operation and maintenance cost is only 60%-70% of traditional factory buildings. If the enterprise needs to expand the production scale or adjust production line in the later period, the steel structure components can be disassembled and recycled, and the factory expansion and internal structure transformation (such as adjusting the floor height and adding equipment foundations) can be quickly completed, the transformation cycle is short and the material reuse rate is more than 80%, greatly reducing the time and capital cost of secondary.
Why Choose Us
Professional team: We have a professional design team composed of senior structural engineers, architectural designers, etc. They have solid professional knowledge and rich practical experience, and can deeply understand the diverse needs of customers, whether it is a conventional industrial plant or a unique commercial building, they can accurately grasp the key points of design. In the early stages of the design process, the team will fully communicate with the client to understand the functional positioning, spatial layout requirements, budget constraints and expected service life of the project in detail, so as to lay a solid foundation for the subsequent design work.
Process quality control: In the process of steel structure processing and production, multiple quality control points are set up. For example, real-time monitoring of key processes such as cutting, drilling, and welding of steel is carried out, and operations are carried out in strict accordance with process standards. Non-destructive testing technology, such as ultrasonic flaw detection, magnetic particle flaw detection, etc., is used to inspect the quality of welded joints to ensure that the welding quality meets the requirements of the design grade. Each completed process, the quality inspection is carried out, and only after passing can the next process be entered to avoid the flow of unqualified products into the next link.
Transportation plan planning: according to the size, weight, quantity of the steel structure, the geographical location of the project site, traffic conditions and other factors, formulate a reasonable transportation plan. Choose the right transport vehicles, such as flatbed trucks, low-bed semi-trailers, etc., to ensure that the goods can be loaded and transported safely and stably.
Choosing our steel structure storage products is to choose professionalism, quality, efficiency and value. We look forward to working with you to create exceptional construction projects.
Company Profile
China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!
Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
FAQ
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2004
Employee Number:
500~500
Ecer Certification:
Verified Supplier
China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an... China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an...
Get in touch with us
Leave a Message, we will call you back quickly!