Payment Terms | T/T, L/C |
Supply Ability | 400,000 Tons / Year |
Delivery Time | 15-20 Days |
Packaging Details | Standard Packing |
Application | Steel Structure Platform, Steel Workshop |
Window Style | Sliding or Roller Window |
Surface Treatment | Hot DIP Galvanized or Painted |
Size | Customized |
Service Life | More Than 50 Years |
Design | CAD Drawings Made by Pkpm Software |
Window Type | Fixed |
Door Type | Sliding Door |
Installation Time | Short |
Weight | Light Weight |
Steel Type | Cold Forming Sectional Steel |
Stiffness | The Overall Stiffness Is Good |
Brand Name | China CT |
Model Number | Prefab Farm Buildings |
Certification | ISO CE |
Place of Origin | China |
View Detail Information
Explore similar products
Modern Industrial Metal Hangar Buildings , Prefab Steel Structure Hangar
High-strength long-span steel structure hangar building galvanized H-shaped
Efficient Prefabricated Large-span Space H-shaped Steel Structure Hangar
Simple construction of hot-rolled H-shaped steel structure aircraft hangar
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 400,000 Tons / Year |
Delivery Time | 15-20 Days | Packaging Details | Standard Packing |
Application | Steel Structure Platform, Steel Workshop | Window Style | Sliding or Roller Window |
Surface Treatment | Hot DIP Galvanized or Painted | Size | Customized |
Service Life | More Than 50 Years | Design | CAD Drawings Made by Pkpm Software |
Window Type | Fixed | Door Type | Sliding Door |
Installation Time | Short | Weight | Light Weight |
Steel Type | Cold Forming Sectional Steel | Stiffness | The Overall Stiffness Is Good |
Brand Name | China CT | Model Number | Prefab Farm Buildings |
Certification | ISO CE | Place of Origin | China |
High Light | modern steel aircraft hangar ,environment friendly aircraft hangar ,steel structure hangar with warranty |
Modern Light Steel Environment Friendly Steel Structure Hangar
Modern Light Steel Environment-Friendly Steel Structure Hangar is engineered to deliver a high-performance, sustainable shelter for civil and military aircraft, helicopters, drones and aviation maintenance operations. By replacing bulky concrete or hot-rolled steel with precision-cold-formed, recyclable galvanized steel, the system cuts total weight by 30-40 % yet exceeds international codes for 50-year design life, 200 km/h wind and grade-8 seismic resistance. The modular bolt-together frame ships in knock-down kits, allowing a 60 m clear-span hangar to be erected in under two weeks with no on-site welding, minimal labour and 95 % material reuse at end-of-life. Closed-section columns and insulated sandwich panels create an air-tight thermal envelope that lowers HVAC energy by 25 %, while integrated solar-ready roofing and rainwater harvesting options further shrink the carbon footprint. The result is an economical, rapidly deployable and fully recyclable hangar that protects valuable aircraft while protecting the planet.
FAQ
1. You are manufacturer or trading company?
We are a manufacturer. And welcome to visit us at any time. The quality control flow and sales team will show you
our professionalism. Also you will can get best and most competitive price after visiting us.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with best quality. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.
4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super market, auto dealer shop, shopping mall, 5 star hotel.
6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after
receiving deposit.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2004
Employee Number:
500~500
Ecer Certification:
Verified Supplier
China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an... China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an...
Get in touch with us
Leave a Message, we will call you back quickly!