Payment Terms | L/C, T/T |
Supply Ability | 5000 Sets per Year |
Delivery Time | 60days |
Packaging Details | Electric and other parts are packed by high quality plywood crates, Main girder packaged by plastic film and woven plastic cloth |
Main lifting speed | 4.5m/min |
Span | 18-35m |
Application | Outdoor |
Steel track | QU70 |
Aux.lifting speed | 12.7m/min |
Power supply | 3 phase 380V 50hz or request |
Brand Name | Dowellcrane |
Model Number | JQJ Beam Launcher Girder Crane |
Certification | ISO CE BV CCC GOST SGS |
Place of Origin | China (Mainland) |
View Detail Information
Explore similar products
Full Span Launcher Crane 600T Girder Erection Machinery 3 Phase 380V 50hz
Construction Project Beam Launcher Crane 100 Ton - 300 Ton Bridge Erection
200t Beam Launcher Bridge Erection Crane Equipment To Move Girder Cabin Control
Rust Prevention Launcher Crane 200 Ton For Highway Bridge Erection
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 5000 Sets per Year |
Delivery Time | 60days | Packaging Details | Electric and other parts are packed by high quality plywood crates, Main girder packaged by plastic film and woven plastic cloth |
Main lifting speed | 4.5m/min | Span | 18-35m |
Application | Outdoor | Steel track | QU70 |
Aux.lifting speed | 12.7m/min | Power supply | 3 phase 380V 50hz or request |
Brand Name | Dowellcrane | Model Number | JQJ Beam Launcher Girder Crane |
Certification | ISO CE BV CCC GOST SGS | Place of Origin | China (Mainland) |
High Light | launching crane ,launching lifting equipment |
Bridge Girder Erection Launcher Construction Machine with Hydraulic System
Product Description
The Bridge Girder Erection Launcher Construction Machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.
Precautions
Disassembly and Maintenance
When removing the truss beam, it should be supported by the sleeper raft, which should be firm and reliable. High-strength bolts dismantled after flame heating need to be scrapped and not inherited. Workers entering the demolition site need to wear safety caps and protective shoes. Workers working on truss beams need to be secure and fully strapped. This is the basic security protection for operating bridge installation equipment.
On-site Installation
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
1955
Total Annual:
1000000-5000000
Employee Number:
100~120
Ecer Certification:
Active Member
Dowell Crane Co., Ltd is a China-leading company in crane manufacture and crane trading business. We serve a broad range of customers from all over the world, providing a complete set of advanced lifting projects, including Gantry crane, Bridge crane, Portal crane, Beam launcher, Electric winch, Li... Dowell Crane Co., Ltd is a China-leading company in crane manufacture and crane trading business. We serve a broad range of customers from all over the world, providing a complete set of advanced lifting projects, including Gantry crane, Bridge crane, Portal crane, Beam launcher, Electric winch, Li...
Get in touch with us
Leave a Message, we will call you back quickly!