China factories

China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground
China ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground

  1. China ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground
  2. China ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground

ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground

  1. MOQ: 1 set
  2. Price: 35000 USD-45000 USD
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 2000 sets/month
Delivery Time 5 days
Packaging Details Wooden box
Product Name ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground Drilling
Drilling Depth 400 Meters
Drilling diameter Φ140-Φ350mm
Dimension 5900x2100x2850mm
Feeding type hydraulic
One push length 6M
Length of drill pipe 1.5m, 2.0m, 3.0m,6.0m
Drilling pipe diameter Φ89, Φ102mm, Φ108mm
Weight 9.8T
Working air pressure 1.7-3.5MPa
After-sales service provided Video technical support
OEM Acceptable
Brand Name Shitan
Model Number ST-400
Certification ISO 9001
Place of Origin Hebei China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 2000 sets/month
Delivery Time 5 days Packaging Details Wooden box
Product Name ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground Drilling Drilling Depth 400 Meters
Drilling diameter Φ140-Φ350mm Dimension 5900x2100x2850mm
Feeding type hydraulic One push length 6M
Length of drill pipe 1.5m, 2.0m, 3.0m,6.0m Drilling pipe diameter Φ89, Φ102mm, Φ108mm
Weight 9.8T Working air pressure 1.7-3.5MPa
After-sales service provided Video technical support OEM Acceptable
Brand Name Shitan Model Number ST-400
Certification ISO 9001 Place of Origin Hebei China
High Light farming water borehole drilling machine400 meters water borehole drilling machine400 meters equipment for borehole drilling

Farming DHT Blasting Deep Water 400 Meters Borehole Drilling Machine

 

 

ST 400 Borehole Drilling Machine Information

 

ST 400 is with 400 meters depth ,suitable for geothermal air conditioning holes and other wells, especially suitable for water intake projects in mountainous areas and rock formations,this rig can both work with mud pump and air compressor .

 

ST 400 Borehole Drilling Machine Main Technical Data

 

Product Name ST 400

Max drilling depth
400 Meters

Drilling diameter
105-325 mm

Air pressure
1.2-3.5mpa

Rod length
3 meter

Rod diameter
89-102-114mm

Main shaft pressure
5T

Lifting force
25T
Power head stroke 6.6M

Max rotary torque
12000Nm

Max rotary speed
100r/ rmin

Secondary winch liftng force
3T

Jacks stroke
1.5m

Moving speed
2.5km/h

Uphill angle
21°Slope

Weight of the rig
8.8T
The engine 92KW / 6 cylinder

Overall dimensions
3900*1600*2350mm

Working condition
Loose layer and bedrock

Drilling method
Hydraulic rotary, down-the-hole impactor

 

ST 400 Borehole Drilling Machine  Advantages

 

1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.

2. The drill rig has more positive speed stages and 14-500r / min speed range, and the output torque is 13428-250N.m.
3. The drilling rig has 2 reverse speeds, which is convenient for handling accidents.
4. The air compressor drilling rig adopts a long-stroke double-speed mechanism, a mechanical power head, and a power head stroke of 3400MM to improve drilling efficiency and reduce the occurrence of plugging and burning accidents.
5. The water well drilling rig rig uses dual oil pumps for oil supply. A single pump is used for drilling, and a double pump is used for confluence when lifting. The power loss is small and the auxiliary time is short.
6. The drilling rig machine has advanced structure and reasonable layout, which is convenient for maintenance, maintenance and repair.
7. The crawler water drilling rig machine chassis is adopted, and the trip of the outrigger
cylinder can be automatically loaded for 1.5m, which is convenient for relocation and transportation.
8. The drill rig reserves some functional interfaces in the hydraulic system, and can expand the functions according to the technological requirements of different users.
 

What is the construction technology of de watering well?

 

Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.

 

Why is the water well drilling rig not suitable for use in rainy days?

 

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.

 
 
 

 
 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement