China factories

China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 50 Meters Borehole Drilling Machine Exploration Small Lightweight
China 50 Meters Borehole Drilling Machine Exploration Small Lightweight

  1. China 50 Meters Borehole Drilling Machine Exploration Small Lightweight
  2. China 50 Meters Borehole Drilling Machine Exploration Small Lightweight

50 Meters Borehole Drilling Machine Exploration Small Lightweight

  1. MOQ: 1 set
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 5000 sets per year
Delivery Time 3 days
Packaging Details Standard Export Package
Product Name ST 50 Borehole Drilling Rig Machine
Drilling Depth 50 Meters
Condition New
Type Core Drilling Rig
Power Type Electric
Usage Coal
Voltage 380V
Warranty 1 Year
Material Steel
Color Optional Red,Yellow
Customized Acceptable
Brand Name Shitan
Model Number ST-50
Certification ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 5000 sets per year
Delivery Time 3 days Packaging Details Standard Export Package
Product Name ST 50 Borehole Drilling Rig Machine Drilling Depth 50 Meters
Condition New Type Core Drilling Rig
Power Type Electric Usage Coal
Voltage 380V Warranty 1 Year
Material Steel Color Optional Red,Yellow
Customized Acceptable Brand Name Shitan
Model Number ST-50 Certification ISO9001
Place of Origin China
High Light 50 meters borehole drilling machineexploration lightweight borehole drilling machine50 meters borehole drilling rig

ST 50 Small Lightweight Borehole Drilling Rig Machine

 

 

ST 50 Borehole Drilling Rig Machine:

 

This drilling rig is light weight, simple structure, fast drilling speed and large diameter of coring samples. It is a commonly used portable hydraulic drill. Max drilling depth is 50 meters ,and hole diameter can be around 110m.

 

ST 50 Borehole Drilling Machine Tech Data:

 

Max drilling depth 50m
Max .opening diameter φ75-φ108mm
End hole diameter 56-75mm
Active drill pipe 50/1000mm
Drill pipe diameter Φ42mm
Drill pipe length 1000mm
Power (diesel engine) 5.8kw(8P)/2200r/min
Size 1400*600*1600mm
Weight 240kg
Spindle
Speed 285-570r/min
Torque 600 N*m
Stroke 1000mm
Lifting force 300KG
Pressure 200KG
Drilling Tower (optional)
Rated load 1t
Height 4m
Tower leg specifications 60mm
Mud Pump
Model BW-50
Flow 50L/min
Max.pressure 1.2Mpa
Times 63/min
Inlet hose diameter φ55mm*2.5m
Outlet hose diameter Φ20mm*10m

 

ST 50 Borehole Drilling Machine Main Advantages:

 

1. Equipped with double oil cylinder hydraulic feeding system, the drilling speed is fast and the work efficiency is high.
2. The drilling rig is equipped with a fixed clamping mechanism and an integrated main rod, which does not need a drill tower and works conveniently.
3. Equipped with 4-speed transmission system. The operator can freely adjust the forward rotation speed through three gears, and is also equipped with a slow reverse gear to facilitate the operator to disassemble the drill pipe and drill tool.
4. The handle is centralized, easy to operate, safe and feasible.

 

Shitan Machinery Drilling Rig Several Attention:

 

Q 1: What kind of drilling rig do you have?

A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .

Q 2: Where is the address of your company?

A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China

Q 3: Are you a manufacturer or a trading company?

A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.

Q 4: How long is your delivery time?

A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.

Q 5: How long is the warranty of your well drilling rig?

A: Except for consumable spare parts, the whole machine shall be one year.

 

How is exploration drilling done?

 

Drilling consists of sinking a drill string into the ground while injecting a special mud. This allows fragments of rock and samples of gas to be brought back to the surface. Boreholes have to be drilled at several locations to delineate the potential deposit.

 
 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement