China factories

China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling
China Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling

  1. China Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling
  2. China Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling

Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling

  1. MOQ: 1 set
  2. Price: USD4500-5800/SET
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 20000 sets per year
Delivery Time Within 7-12 days
Packaging Details wooden box
Name GK 200 Borehole Drilling Rig
Power Type Diesel
Voltage 220v
Dimension(L*W*H) 1730*860*1360
Application water well,railways, core
Type Small core drill rig
Max Drilling Depth 200 meter
Drilling diameter 300 mm
Color Customized
Warranty 24 months
OEM Acceptable
Place of origin Hebei,China
Brand Name ShiTan
Model Number GK-200
Certification ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 20000 sets per year
Delivery Time Within 7-12 days Packaging Details wooden box
Name GK 200 Borehole Drilling Rig Power Type Diesel
Voltage 220v Dimension(L*W*H) 1730*860*1360
Application water well,railways, core Type Small core drill rig
Max Drilling Depth 200 meter Drilling diameter 300 mm
Color Customized Warranty 24 months
OEM Acceptable Place of origin Hebei,China
Brand Name ShiTan Model Number GK-200
Certification ISO9001 Place of Origin China
High Light 220v borehole drilling machinelightweight shallow borehole drilling machine200 meters depth borehole driller

GK 200 Borehole Drilling Rig

 

 

GK 200 Borehole Drilling Rig Description

 

GK200 is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.Mainly used for geological general investigation and exploration,road and tall buliding foundation exploration

 

GK 200 Borehole Drilling Rig Tech Data

 

GK 200 Borehole Drilling Rig
Drilling diameter(mm) 75-300mm
Drilling depth (m) 200-30m
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Oil pump
Oil pump type YBC -20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1115
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 146

 

GK 200 Borehole Drilling Rig Main Features

 

1.Engine:Feed by hydraulic cylinder,the drilling efficiency is higher and it can save labor.
2.Drill rod:53x59 drilling rod adopted,high rigidity and strong delivery torque.
3.Spindle:Vertical spindle are fixed by four groups of bearing to ensure that the rotary machine is rigid
enough for gravel layer and other complex geoloical conditions.
4.Mud pump:Equip mud pump with flow 160L/min,save cost and also make the structure compact.
5.Concentrated handle, small footprint,light weight, strong decomposition, easy to move.

 

What is the construction technology of de watering well?

 

Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.

 

The water well drilling rig is maintained at different times

 

The maintenance of water well drilling rig is very important, which can prolong the service life of the equipment, keep the water well drilling rig in a good operation state for a long time, reduce the maintenance cost and ensure the personal safety of operators.

1. Monthly maintenance:

Thoroughly carry out the items required by shift and weekly maintenance.

Remove the chuck and clean the slip and slip seat. Replace in time if damaged.

Clean the filter in the oil tank and replace the deteriorated or dirty hydraulic oil.

Check the main parts and components. If damaged, replace them in time. Do not work with injuries. Completely eliminate the faults occurred in this month.

If the well drilling equipment is not used for a long time, all exposed parts (especially the surface of the processing surface) shall be coated with grease.

2. Weekly maintenance:

Thoroughly carry out the items required by shift maintenance.

Remove the dirt and soil on the tooth surface of chuck and slip.

Clean the oil and mud on the inner surface of the holding brake.

Eliminate faults that occur within this week.

3. Shift Maintenance:

Check whether all exposed bolts, nuts and safety pins are firm and reliable.

Eliminate other faults in the shift.

Check the oil leakage everywhere and deal with it as appropriate.

Check the oil level of transmission, transfer case and hydraulic system oil tank.

Add lubricating oil or grease according to the lubrication requirements.

Wipe the external surface of the well drilling rig equipment, and pay attention to the cleanness and good lubrication of the surface of the well drilling rig base, slide-way, vertical shaft and so on.

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement