Payment Terms | T/T, Western Union |
Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days |
Packaging Details | Standard Export Package |
Product Name | GK 200 Trailer Mounted Drilling Rigs |
Type | Core Drilling Rig |
Drilling Diameter | 75-200mm |
Drilling Depth | 200m |
Power Type | Diesel |
Usage | Water Well,geological exploration |
Power(W) | 16.2kw |
Spindle Speed | 30-1050r/min |
After sale service | Video Support |
Place of origin | Hebei,China |
Brand Name | JINZHOU SHITAN |
Model Number | GK 200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
High Speed Small Trailer Mounted Water Well Drilling Rig With 110 Meters Depth
BW160 200 Meter Rubber Trailer Mounted Drilling Rigs
Deep Underground 105-180mm Trailer Mounted Drill Rig For Farming ST 180
Shallow Water Borehole Trailer Mounted Drilling Rigs 150 Meters XY-1A
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days | Packaging Details | Standard Export Package |
Product Name | GK 200 Trailer Mounted Drilling Rigs | Type | Core Drilling Rig |
Drilling Diameter | 75-200mm | Drilling Depth | 200m |
Power Type | Diesel | Usage | Water Well,geological exploration |
Power(W) | 16.2kw | Spindle Speed | 30-1050r/min |
After sale service | Video Support | Place of origin | Hebei,China |
Brand Name | JINZHOU SHITAN | Model Number | GK 200 |
Certification | ISO9001 | Place of Origin | China |
High Light | 200 Meters Diamond Core Drill Rig ,200 Meters Spt Drilling Machine ,Diamond Core Drill Rig Diesel Powered |
SPT Diamond Coring Engineering 200 Meters Trailer Mounted Water Well Drilling Rigs
Product Description
Gk200 drilling rig is with a depth 200 meters ,and hole diameter is from 75mm-300mm.·wheeled walking mechanism, very convenient for transport and adjusting the drilling rig level. ·pressure gauge display the condition of the bottom of the drill hole. ·the drilling rig is equipped with a ball card holding mechanism instead of chuck, and it can be operated without stopping the rod. ·the working efficiency is high and the operation is convenient, safe and reliable.
Porduct Technical Data
GK 200 Drilling Rig Model | |
Drilling hole diameter(mm) | 75,91,110,130,150,300 |
Drilling depth (m) | 200,150,100,70,50,30 |
Drill pipe diameter (mm) | 42,50 |
Drilling angle(°) | 90~75 |
Equipment size(L * B * H) | 1730 * 860 * 1360 (mm) |
Rig weight (except engine) | 700 |
Gyrator | |
Spindle speed (four gear) (r/min) | 115,230,505,1010 |
Spindle travel(mm) | 450 |
Spindle no-load lifting maximum moving speed(m/s) | 0.05 |
Spindle no load drop maximum movement speed(m/s) | 0.067 |
Spindle maximum feed pressure(KN) | 15 |
Spindle maximum lifting force(KN) | 25 |
Spindle maximum output torque(KN• m) | 1.5 |
Product Main Features
1.Engine:Feed by hydraulic cylinder,the drilling efficiency is higher and it can save labor.
2.Drill rod:53x59 drilling rod adopted,high rigidity and strong delivery torque.
3.Spindle:Vertical spindle are fixed by four groups of bearing to ensure that the rotary machine is rigid enough for gravel layer and other complex geoloical conditions.
4.Mud pump:Equip mud pump with flow 160L/min,save cost and also make the structure compact.
5.Concentrated handle, small footprint,light weight, strong decomposition, easy to move.
Product Application
It is suitable for geological survey, geological core drilling, small grouting holes, blasting holes and small water well holes of railway, water conservancy, bridge, dam foundation and other buildings.is mainly used for geological general investigation and exploration, road and tall building foundation exploration, kinds of hole in concrete structure, river levees, civil wells and earth temperature central air-conditioner
Why is the water well drilling rig not suitable for use in rainy days?
After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!