Delivery Time | Within 7-12 days |
Payment Terms | T/T, Western Union |
Product Name | Meters Crawler Mounted Drill Rig |
Application | Core Sampling,Water Well,Bore We |
Usage | Water Well,civil construction |
Power Type | Diesel,electric |
Dimension(L*W*H) | 2400*950*1400mm |
Maximum opening diameter | 200-400mm |
Borehole inclination | 90~75° |
Type | Rotary Drilling Rig, Core Drilling Rig, Air percussion, anchor drilling machine, anchoring drilling rig |
Condition | New |
Color | Yellow ,Customized |
Place origin | Hebei,China |
Model Number | XY-2 |
Place of Origin | China |
Brand Name | ShiTan |
Certification | ISO9001 |
View Detail Information
Explore similar products
550KG Hydraulic Core Drilling Machine
Multifunctional 1.9m/S 600m Crawler Mounted Drill Rig
GK 200 Portable Hydraulic Crawler Mounted Drilling Rig With 8 Wheels Folding
Diesel Rock 28kw 180m Crawler Mounted Drill Rig
Product Specification
Delivery Time | Within 7-12 days | Payment Terms | T/T, Western Union |
Product Name | Meters Crawler Mounted Drill Rig | Application | Core Sampling,Water Well,Bore We |
Usage | Water Well,civil construction | Power Type | Diesel,electric |
Dimension(L*W*H) | 2400*950*1400mm | Maximum opening diameter | 200-400mm |
Borehole inclination | 90~75° | Type | Rotary Drilling Rig, Core Drilling Rig, Air percussion, anchor drilling machine, anchoring drilling rig |
Condition | New | Color | Yellow ,Customized |
Place origin | Hebei,China | Model Number | XY-2 |
Place of Origin | China | Brand Name | ShiTan |
Certification | ISO9001 | ||
High Light | 200m Crawler Mounted Drill Rig ,Automatic Crawler Mounted Drill Rig ,hydraulic core drilling machine |
Top Quality Automatic High Speed XY-2 400 Meters Crawler Mounted Drill Rig
XY-2 400 Meters Crawler Mounted Drill Rig Description
XY-2 400 Meters Crawler Mounted Drill Rig Description Mainly applies to drill water well for farm /industry irrigating, fresh water drinking or anywhere need fresh water. Geological/Geo-technical explorations, earth sample taking, etc.
XY-2 400 Meters Crawler Mounted Drill Rig Specifications
| |||
Drill | Swivel Head | ||
Drilling depth | Max.200~400m | Spindle speed | 60 105 165 228 235 405 638 880 r/min |
Hole diameter | Max.600m | Spindle stroke | 550kmm |
Drill rod diameter | 42mm | Spindle pull-down | Max.50KN |
Angle range | 0°~360° | Spindle lifting capacity | Max. 37KN |
Oil pump | Water pump | ||
Model | YBC-20/125 | Model | Gear oil pump |
Rated pressure | 8Mpa | Working pressure | Max. 10Mpa |
Flow speed | 20ml/r | | |
Rated speed | 150r/min | | |
Hoist | Power(diesel) | ||
Max. lifting capacity | 212kgs | Model(diesel engine | ZS1115 |
Hoisting drum revolution | 20.39.85.170r/m | Rated power | 18.5KW |
Drum diameter | 140mm | Rated speed | 1800 r/min |
WEIGHT | AROUND 980kgs | ||
SIZE | 2330x1050x1620mm |
Attention in Drilling Process Of XY-2 400 Meters Crawler Mounted Drill Rig
1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.
2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.
3. Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.
Crawler Mounted Drill Rig Main Features
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!