Payment Terms | L/C, T/T |
Supply Ability | 1000PCS |
Delivery Time | 10work days |
Packaging Details | Wooden box |
Product Name: | Hydraulic lift platform |
Model: | SJY |
Structure: | Scissors |
Drive: | Electric Hydraulic |
Power: | 220V/380V |
Table size(mm) | 2100*820 |
Capacity(kg) | 1000kg |
Lifting heig(m) | 4 |
Brand Name | KENI |
Model Number | SJY03-4 |
Certification | CE ISO |
Place of Origin | XINXIANG,CHIAN |
View Detail Information
Explore similar products
Electro Hydraulic 2000kg 15M Aerial Lifting Platform
Mobile Shears 5.5KW Hydraulic Aerial Lifting Platform
High Altitude Climbing Truck 12m Hydraulic Scissor Lift Platform
Heavy Industry Movable 860mm Aerial Lifting Platform
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 1000PCS |
Delivery Time | 10work days | Packaging Details | Wooden box |
Product Name: | Hydraulic lift platform | Model: | SJY |
Structure: | Scissors | Drive: | Electric Hydraulic |
Power: | 220V/380V | Table size(mm) | 2100*820 |
Capacity(kg) | 1000kg | Lifting heig(m) | 4 |
Brand Name | KENI | Model Number | SJY03-4 |
Certification | CE ISO | Place of Origin | XINXIANG,CHIAN |
High Light | 1000kg Aerial Lifting Platform ,4m 1000kg Aerial Lifting Platform ,1000kg scissor lift work platform |
1000kg Trail-type small platform folding scissor lift with extension platform
1. The lifting platform has been inspected and debugged at the factory before delivery. All the technical indexes have reached the design requirements. When using, the lifting platform only needs to be connected with the power supply, and the hydraulic system and electrical system need not to be adjusted.
2. The platform should be carefully checked before use of hydraulic, electrical systems, no leakage or naked leakage before use.
3. Lifting platform in use, the four legs should be firmly supported on a solid ground (with the wheel to leave the ground shall prevail) if necessary, the use of sleepers.
4. Lifting platform empty run 1-3 times before loading operation.
5. load center of gravity should be as far as possible in the center of the table.
6. Guard railings at both ends of the movable door should be locked after the lock operation.
1, Maintenance introduction
a. Wheels, countershafts and bearings, cylinder pin and bearing, jib hinge shaft and bearing wear.
b. All parts are filled with some lubricants to extend the service life of bearings.
c. Hydraulic oil and oil level. Lifting platform throughout the rise, in this position, the hydraulic floor should be higher than the bottom 40 to 50 mm. If it is found that the hydraulic oil is dark, sticky or gravel and other foreign objects should be promptly replaced (winter replacement 32 # hydraulic oil, summer 46 # hydraulic oil. In particularly cold northeast, should be replaced transformer hydraulic oil).
2, Mid-year inspection
a, According to the order of six months or 500 hours prioritized.
b, The whole platform will rise and fall, into a brace.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2013
Total Annual:
76923076-85000000
Employee Number:
100~726
Ecer Certification:
Active Member
Henan Kone Crane Co., Ltd. is located in the Changyuan Crane Industrial Park, Henan Province, known as the "Hometown of Cranes in China". The company has a registered capital of 128 million yuan. It is the hometown of Chinese cranes-Changyuan, which integrates R&D, design, manufacturin... Henan Kone Crane Co., Ltd. is located in the Changyuan Crane Industrial Park, Henan Province, known as the "Hometown of Cranes in China". The company has a registered capital of 128 million yuan. It is the hometown of Chinese cranes-Changyuan, which integrates R&D, design, manufacturin...
Get in touch with us
Leave a Message, we will call you back quickly!