Payment Terms | T/T |
Supply Ability | 3000SETS |
Delivery Time | 5-8DAYS |
Packaging Details | in bulk |
Brand Name | goodeng |
Model Number | GS6000-TS |
Certification | ISO9001 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
GS500AT-LS horizontal directional drilling machine, all terrain horizontal
GS50-LS horizontal directional drilling machine, 5ton horizontal directional
GS130-LS horizontal directional drilling machine, 13ton horizontal directional
GS150-LS horizontal directional drilling machine, 15ton horizontal directional
Product Specification
Payment Terms | T/T | Supply Ability | 3000SETS |
Delivery Time | 5-8DAYS | Packaging Details | in bulk |
Brand Name | goodeng | Model Number | GS6000-TS |
Certification | ISO9001 | Place of Origin | CHINA |
GS6000-TS horizontal directional drilling machine, 600ton horizontal directional drilling machine, 600ton hdd machine, 600ton hdd rig, goodeng hdd machine 600ton, goodeng hdd rig 600ton,
I. Project Profile
Project Name:China Petroleum and Chemical Corporation & Kuwait National Oil Company Limited Joint Project ---Zhanjiang, Lianjiang Product Oil Pipeline Project Sea Area HDD Works
The Owner/Construction Party:China Petrochemical Marketing Co. Ltd -Huanan branch
Construction Organization:Sinopec Shengli Oil Construction Engineering Co. LTD
Project Characteristics:More than 4 km HDD Works. The longest Land -Sea HDD Project in China
Geological Conditions:Plain Fill, Sludge, Silty Clay, Weathered Basalt
Topographic Condition:The HDD entry point of Tongming Strait is in a village,Tongming Strait exit point is in a farmland beside the seawall.
Construction difficulties:
1. Distance: 4071 meters HDD Project (370 steel pipes welded together);
2. Complex geologic structure, High Demand of Mud Matching;
3. Prefabricated curve should meet the demand of radius of curvature
II. Construction Equipment
Two sets of GS6000-T, Two sets of GS5000-L, One set of GT5000 Ejector Sleeve, Six sets of CN2500 Mud Pump, Two sets of American ParaTrack2 Location system.III. Technical Support
Risk Prevention:Construction site is equipped with 1 set of GT5000 Ejector Sleeve; When reaming back, it adopts turning rolls and pipe ditch to send pipeline, protecting all turning points.
Reaming(second time):Using 500mm, 800mm Fluted Reamer
Pulling pipeline:Using Barrel Reamer
IV. Construction Time
Start Time:March 15th, 2019
Finish Time: May 17th, 2019
V. Auxiliary Mud
Mud Specifications:Marsh Funnel Viscosity 80S-100S.
VI. Construction Conclusion
It is the first time for us to finish such a long-distance project in China, it is a valuable experience for future construction project.
Company Details
Ecer Certification:
Site Member
“Goodeng Machine" was established in May 2002, is a national high-tech enterprise engaged in R&D, production, sales and service of trenchless machinery, piling machinery, mining machinery, the main products are GS series of horizontal directional drilling machine, GPY series... “Goodeng Machine" was established in May 2002, is a national high-tech enterprise engaged in R&D, production, sales and service of trenchless machinery, piling machinery, mining machinery, the main products are GS series of horizontal directional drilling machine, GPY series...
Get in touch with us
Leave a Message, we will call you back quickly!