Product Specification
|
|
|
|
Brand Name |
SANY |
Model Number |
SYM5230THB 390C-10 |
Place of Origin |
China |
| |
The SANY C10 Series Concrete Pump Truck is an equipment developed by SANY Heavy Industry to meet the needs of efficient and precise construction. Integrating advanced technologies, it enables long - distance and high - precision concrete delivery, facilitating efficient operations in various construction projects. With reliable performance and excellent performance in the industry, it has become the first choice for many construction parties.
Equipped with a high - performance pumping system, it has stable concrete output and large displacement, which can quickly complete the pouring operation and improve the construction progress, suitable for large - scale continuous pouring scenarios. For example, in the pouring of the foundation raft of high - rise buildings, it can efficiently deliver concrete and reduce construction time.
With an advanced boom design, multiple booms cooperate with each other, with high precision and flexibility in movement. It can flexibly adjust the 布料 position (material distribution position) and adapt to complex building structures. Even in narrow construction sites or special - shaped building construction, it can accurately deliver concrete to the designated area.
Equipped with an intelligent control system, it can real - time monitor the operating parameters of the equipment (such as pressure, flow, boom status, etc.), realize fault early warning and automatic protection. It can also perform remote operation and data transmission, facilitating construction management and maintenance, and reducing the risk of human operation errors.
Key components are made of high - quality materials and exquisite craftsmanship. The whole vehicle has undergone strict testing, with high structural strength and strong wear - resistance, adapting to harsh construction environments, reducing the equipment failure downtime, and ensuring long - term stable operation.
From the basement foundation to the upper floor structure, the pump truck boom can cover different heights and positions, realizing the vertical and horizontal delivery of concrete and completing the pouring of components such as columns, beams, and slabs.
It is used for the pouring of the lower foundation (pier) and upper beam of the bridge. Especially in bridge construction across rivers and roads, it can flexibly distribute materials and meet the requirements of large - volume and high - precision concrete pouring.
In the construction of large - area and large - span floor and frame structures of industrial factory buildings, it can efficiently deliver concrete, ensuring construction quality and progress, suitable for the construction of single - storey or multi - storey factory buildings.
For concrete pouring in subway stations and urban road reconstruction, it can accurately operate in complex urban traffic environments and limited construction sites, completing the construction of station floor slabs, side walls, road bases, and surface layers.
Since the pictures do not provide all precise parameters, it is recommended to confirm the detailed technical specifications in combination with the equipment nameplate and official information.
Cause: Hydraulic system leakage, solenoid valve failure, poor contact of the control circuit.
Solution: Check the sealing of the hydraulic pipeline, repair or replace the leaking components; detect the solenoid valve, replace it if there is a fault; troubleshoot the circuit and repair the poor contact points.
Cause: Main oil pump wear, hydraulic oil pollution, valve group failure.
Solution: Overhaul or replace the main oil pump; filter and replace the hydraulic oil; check the valve group, repair or replace the faulty valve parts.
Cause: Improper concrete proportion (such as too large aggregate, small slump), too long pumping interval, wear of the inner wall of the pipeline.
Solution: Adjust the concrete proportion to meet the pumping requirements; shorten the pumping interval and clean the pipeline in time; check the pipeline, and replace it if the wear is serious.
Cause: Insufficient battery power, starter motor failure, control module damage.
Solution: Charge or replace the battery; overhaul the starter motor; detect the control module and replace it if necessary.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
-
Business Type:
Manufacturer,Exporter
-
-
Total Annual:
5000000-10000000
-
Employee Number:
50~100
-
Ecer Certification:
Verified Supplier
+ Read More