Payment Terms | T/T, L/C |
Supply Ability | 100,000 tons/year |
Delivery Time | 3-7 days |
Packaging Details | plastic barrels, carton, wooden pallet |
color | 1000+ popular colors available |
Application Method | Roller, brush, or sprayer |
Drying Time | 2 hour |
Eco-Friendly | Yes |
VOC Level | Low,undetectable |
Brand Name | Lantiden |
Model Number | LNSB002 |
Certification | CE, TUV, PSB, A+, CCC,TenRing |
Place of Origin | China |
View Detail Information
Explore similar products
Green Earth Interior Wall Paints Formaldehyde Purification Water Based Paint
Eco Friendly Water Based Interior Paint Odor Free No Irritating Odor Strong
Eco Friendly Water Based Paint For Walls Good Covering Power Strong Adhesion
Stain Resistant Water Based Paint Purify Formaldehyde Odor Less Plant Extraction
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 100,000 tons/year |
Delivery Time | 3-7 days | Packaging Details | plastic barrels, carton, wooden pallet |
color | 1000+ popular colors available | Application Method | Roller, brush, or sprayer |
Drying Time | 2 hour | Eco-Friendly | Yes |
VOC Level | Low,undetectable | Brand Name | Lantiden |
Model Number | LNSB002 | Certification | CE, TUV, PSB, A+, CCC,TenRing |
Place of Origin | China | ||
High Light | 10kg Sealing Primer ,Sealing Primer Alkali Resistant |
10kg Alkali-Resistant Sealing Primer Seal The Base Layer And Protect The Topcoat Effect Strong Adhesion
Product Features
1. Good alkali resistance: effectively inhibit the precipitation of alkaline substances on the wall, and protect the decorative effect of the topcoat for a long time.
2. Good hiding power: cover fine cracks and save the amount of topcoat.
3. Healthy and environmentally friendly: low content of harmful substances such as formaldehyde, benzene, and soluble heavy metals.
4. Simple construction.
Product Use
Suitable for use with interior wall topcoat primer.
Technical Parameters
Theoretical dosage: about 8-10㎡/KG/1 coat, the actual consumption varies depending on the construction method and the flatness of the base.
Dilution ratio: according to the actual situation, no more than 5% of clean water can be added for dilution.
Drying time: about 2 hours for surface drying; recoating time is at least 2 hours (25℃, 50% relative humidity), and it can be extended moderately at low temperature.
Maintenance time: 7 days/25℃, low temperature (not less than 5℃) can be extended to obtain an ideal coating effect.
Implementation standards: GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings", GB/T9756-2018 "Synthetic Resin Emulsion Interior Wall Coatings".
Product specifications: 20KG/barrel.
Shelf life: See product label.
Usage
Construction methods: rolling, spraying, brushing, etc.
Construction environment: It is not suitable for construction when the temperature is below 5℃ or the relative humidity is above 80%.
Base treatment: Before construction, clean the base surface to be painted to ensure that the construction surface is clean, free of grease, floating dust, mold algae and other attachments; the construction surface must be flat and dry, without hollows, holes, protrusions, etc.; new base surfaces such as ash sand, plaster, cement, etc. (pH value is less than 10, moisture content is less than 10%) should be dried before construction.
During construction, please configure necessary protection and labor protection supplies according to local operating specifications, such as protective glasses, gloves and professional construction clothes.
Before construction, stir thoroughly and use in a certain proportion. The mixing container must be clean and free of other chemical substances.
Please use clean water to clean the equipment in time during and after construction.
Precautions
If the product leaks, it can be covered with sand or soil for absorption.
For the treatment of pollutants after absorption, including cans and unused containers, they should be handled in accordance with local environmental protection standards.
Never discharge discarded paint waste into drains or water sources.
If this product accidentally enters your eyes when using it, please rinse with clean water in time. If you feel uncomfortable, please seek medical treatment in time.
In order to better protect the legitimate rights and interests of users, please do not purchase products with incomplete labels and beware of counterfeiting.
For any unknown information, please ask the local dealer for the product manual.
Storage conditions
Store in a closed place at 5℃~35℃ in a cool and dry place, strictly prevent frost and avoid sunlight.
Density | 1.4g/ml±0.05% |
Color | White |
Gloss | ≤60° |
Contrast ratio | ≥0.93 |
Alkali resistance (24 h) | No abnormality in coating |
Stability(-5C) | No degradation |
Scrubbing resistance | ≥1000 times |
Constructability | No obstacles in applying two coats |
VOC | Below the detection limit |
Formaldehyde content | Below the detection limit |
Total content of benzene series | Below the detection limit |
Total lead (Pb) content | Below the detection limit |
Soluble heavy metal content | Below the detection limit |
Solvent type | Water-based |
Theoretical coverage | 8-9㎡/1KG/1 times |
Dilution ratio | Can be diluted with no more than 5% of clean water |
Drying time | Surface drying time ≤2h |
Maintenance time | 7 days/25℃, extended at low temperatue (not less than 5℃) |
Implementation standard | GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings" |
Product specification | 20KG/barrel; |
Shelf life | 24 months |
Storage | Store in a sealed, cool and dry place at 5℃~35℃, prevent frost and avoid sunlight. |
Construction methods | Spray painting;Roller painting;Brush painting |
Company Details
Business Type:
Manufacturer
Year Established:
2014
Total Annual:
30 million-40 million
Employee Number:
100~150
Ecer Certification:
Verified Supplier
Company Profile Founded in 2014, Lantiden New Environmental Construction Material Co.,Ltd invested 3 billion yuan to establish Asia's largest diatom industrial park in Yueyang, Hunan.With a total construction area of about 310,000 square meters. The first phase of the project covers 100 acre... Company Profile Founded in 2014, Lantiden New Environmental Construction Material Co.,Ltd invested 3 billion yuan to establish Asia's largest diatom industrial park in Yueyang, Hunan.With a total construction area of about 310,000 square meters. The first phase of the project covers 100 acre...
Get in touch with us
Leave a Message, we will call you back quickly!