Payment Terms | L/C, T/T, MoneyGram, Western Union |
Supply Ability | 4 units per month |
Delivery Time | 20 days |
Packaging Details | Nude in container |
Material | Carbon steel |
Power source | Diesel engine or electricty |
Brand Name | KD-Headdredging |
Model Number | HDTJ-200 |
Certification | ISO9000 |
Place of Origin | China |
View Detail Information
Explore similar products
africa popular big and small trommel 10-200 tph alluvial gold mine washing plant
Gold Washer Machine 10-75 Tph Rotary Trommel Screen Mineral Separation Machine
africa popular small trommel 200 tph alluvial gold mine washing plant for sale
Mine Equipment 75tph 150t/h Gold Trommel Wash Plant rotary drum scrubber
Product Specification
Payment Terms | L/C, T/T, MoneyGram, Western Union | Supply Ability | 4 units per month |
Delivery Time | 20 days | Packaging Details | Nude in container |
Material | Carbon steel | Power source | Diesel engine or electricty |
Brand Name | KD-Headdredging | Model Number | HDTJ-200 |
Certification | ISO9000 | Place of Origin | China |
High Light | 200TPH Gold Trommel Wash Plant ,200T/H Gold Trommel Wash Plant ,200TPH mobile gold wash plant |
Carbon Steel And Two Mesh Screen 200 Ton Per Hour Soil Washing Drum Plant For Gold Mining Seperate
Introduction
1. Drum screen trommel with scrube drum for soil and gravel wahsing
2. Big water pump and Engine generator set equiped.
3.Grill equiped on feeder
4. Trailer wheel equiped
5. Vibration chute and sluice box equiped.
Main Features
1) Patented unique design allows the trommel screen to have higher capacity, longer drum life and no blockage.
2) Easy to move, it can be dragged by wheel loader or excavators.
3) Gold Recovery rate can be more than 90%
4) Low water and electricity requirements
5) Customized by your detailed requirement.
Parameters
1. Why Choose Our Company?
-Our company is a modern formal company which has been re-registered after the integration of the company. We professionally produce, process and sale more than a dozen of series equipments such as gold mining equipment, sand producing and mining equipments,sieving equipments,dredging equipments, and magnetic separation equipments etc.We also work on related machinery accessories.
2. What is the delivery time?
-Usually it need 40-60 days to manufacture,when its a small size equipment,it can delivery by container,but when its a big equipment,it can delivery by bulk,we can provide high quality after-sale service,our engineer will guide to assemble the dredger at your worksite.
3. What is the payment terms?
-30%T/T as payment, 70% deposit before delivery the goods.
4. Are you products certified or patented?
-Yes, we provide certified products.
5. Can you offer good customer service?
-Yes, the warranty of all our products is one year and all spare parts will be provided fast and cheap forever.
6. Can we go to your factory?
-Of course, welcome to you come to our factory anytime.
Company Details
Business Type:
Manufacturer
Year Established:
2011
Total Annual:
10000000-30000000
Employee Number:
50~200
Ecer Certification:
Active Member
Qingzhou KEDA Environment Protection Machinery Co., Ltd. is a company specialized in producing dredgers, aquatic weed harvesters, gold mining machines and greenhouses. Head Dredging aims to meet the needs of our customers by providing competitive and high-quality services, such as dredging tech... Qingzhou KEDA Environment Protection Machinery Co., Ltd. is a company specialized in producing dredgers, aquatic weed harvesters, gold mining machines and greenhouses. Head Dredging aims to meet the needs of our customers by providing competitive and high-quality services, such as dredging tech...
Get in touch with us
Leave a Message, we will call you back quickly!