Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Automotive |
Color | Black |
Compatibility | Universal |
Features | Durable, Easy to Use, Comprehensive Set |
Material | Steel |
Product Type | Repair Set |
Size | Standard |
Warranty | 1 Year |
Brand Name | HDPARTS |
Model Number | D662 |
Place of Origin | China |
View Detail Information
Explore similar products
For Caterpillar Engine 3204 Cylinder Liner Kit 9L7737 1W1661 9N5082 Mechanical
For Cummins Engine B3.3 E2170 Cylinder Liner Kit 4089143 C6204312170 4941138
For Caterpillar Engine C15 Cylinder Liner Kit 197-9322 346-6615 310-4188
For Caterpillar Engine 1306 Cylinder Liner Kit Mechanical Diesel Engine Repair
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
OEM Service | Available | Packing | Plastic bag , Box , Carton |
Application | Automotive | Color | Black |
Compatibility | Universal | Features | Durable, Easy to Use, Comprehensive Set |
Material | Steel | Product Type | Repair Set |
Size | Standard | Warranty | 1 Year |
Brand Name | HDPARTS | Model Number | D662 |
Place of Origin | China | ||
High Light | D662 Overhaul Repair Kit ,Con Rod Bearing Overhaul Repair Kit |
Specification
Applicable models | D662 |
Type | Overhaul Rebuild Kit |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Product Description
Kubota D662 overhaul repair kits typically include the following mechanical accessories and parts:
Piston group: including piston, piston ring, piston pin, etc.
Cylinder liner set: including cylinder liner, gasket, etc.
Crankshaft group: including crankshaft, crankshaft bearings, etc.
Connecting rod group: including connecting rod, connecting rod bearing, etc.
Water pump set: including water pump, water pump shaft, etc.
Oil seal group: including front oil seal, rear oil seal, etc.
Cylinder head group: including cylinder head, valves, valve springs, etc.
Oil pan group: including oil pan, oil pan gasket, etc.
Water tank set: including water tank, water tank cover, etc.
Oil seat set: including oil seat, oil seat gasket, etc.
The above are the mechanical accessories in the Kubota D662 overhaul repair kit under normal circumstances. The specific kit content may vary depending on the supplier or manufacturer. When purchasing, it is recommended to verify the parts included in the kit with the supplier or manufacturer to ensure that the required repair parts and components are complete.
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Shipping Guide
Handling Time:
We strive to ship your order within 1-30 business days after receiving cleared payment.
Delivery Time:
For expedited shipping options such as FedEx, DHL, USPS, and UPS, the estimated delivery time is 2-6 workdays for shipments to the USA and 3-8 workdays for shipments to other countries. However, please note that international delivery times may vary depending on the courier company and local customs/duties procedures.
Shipping Address:
To ensure a smooth and successful delivery, please provide us with the correct, precise, and detailed shipping address. It is essential to double-check the accuracy of your shipping information. Additionally, kindly include your correct phone number to facilitate seamless communication between you and the carrier for smooth delivery.
Taxes:
Please be aware that import duties, taxes, and charges are not included in the listed product price or freight charges. These additional charges are the buyer's responsibility. We recommend checking with your local customs office to determine any potential additional fees or duties that may apply to your shipment.
Track Your Order:
Once your order is processed, you will receive an email containing your carrier and tracking number. This tracking number will allow you to monitor the progress of your purchase. Keep an eye on your shipment by clicking on the links provided below:
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!