China factories

China factory - Changsha Potency Mechanical Technology Co., Ltd.

Changsha Potency Mechanical Technology Co., Ltd.

  • China,Changsha ,Hunan
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 25m Arch Installation Trolley with 3000Kg Main Arm Capacity
China 25m Arch Installation Trolley with 3000Kg Main Arm Capacity

  1. China 25m Arch Installation Trolley with 3000Kg Main Arm Capacity

25m Arch Installation Trolley with 3000Kg Main Arm Capacity

  1. MOQ: 1 Unit
  2. Price: Negotiable
  3. Get Latest Price
Packaging Details FR or Bulk Ship
Delivery Time 45 working days
Payment Terms T/T, L/C
Supply Ability 120 units per year
Maximum Load-bearing Capacity of The Auxiliary Arm 1500Kg
Dual Power Diesel & Electric
Model Arch Installation Robot KGM12300CSG
Max.Operating Width 25m
Ground Cleareace 450mm
Min.Operating Width 5m
Transportation Dimension (L X W X H) 9200×2600×3500mm
Maximum Load-bearing Capacity of The Main Arm 3000Kg
Brand Name POTENTIAL / POTENCY
Model Number KGM12300CSG
Place of Origin CHINA
Certification ISO9001:2015

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Packaging Details FR or Bulk Ship Delivery Time 45 working days
Payment Terms T/T, L/C Supply Ability 120 units per year
Maximum Load-bearing Capacity of The Auxiliary Arm 1500Kg Dual Power Diesel & Electric
Model Arch Installation Robot KGM12300CSG Max.Operating Width 25m
Ground Cleareace 450mm Min.Operating Width 5m
Transportation Dimension (L X W X H) 9200×2600×3500mm Maximum Load-bearing Capacity of The Main Arm 3000Kg
Brand Name POTENTIAL / POTENCY Model Number KGM12300CSG
Place of Origin CHINA Certification ISO9001:2015
High Light 25m arch installation trolley3000kg capacity arch trolleyheavy-duty arch installation equipment

Max.Operating Width 25m Arch Installation Cart for Maximum Ground Clearance and Efficiency

Product Description:

Dual Power System Innovation
Adopting a hybrid design of diesel and electric power, the diesel engine provides high-intensity operation power in the tunnel (according to the National III emission standard), while the electric motor (IE3 high-efficiency three-phase asynchronous) meets the construction needs of urban areas or enclosed spaces with low noise and zero emissions. The power switching response time is less than 30 seconds. The dual power redundancy design ensures that the equipment can maintain 50% of its basic operational capacity in the event of a single system failure, significantly improving the continuity of tunnel construction.

Breakthrough in Plateau Adaptability
By using turbocharging matching and ECU high-altitude calibration technology, the rated power output can be maintained at an altitude of 4500 meters and in extreme environments ranging from -25 ℃ to 50 ℃, with a power attenuation rate of less than 8% (industry average of 15%). The hydraulic system is equipped with a constant power control and oil temperature adaptive adjustment module to solve the problem of starting at low temperatures on high altitudes.

Core Performance Advantages
Full Coverage Capability of Construction Methods
Unique folding+telescopic three-arm structure, supporting synchronous construction of full section/two-step/three-step, with a maximum of 6 high-speed railway double track tunnel arches installed per shift (3 traditional equipment). The 7-degree-of-freedom robotic arm is equipped with a millimeter-level laser positioning system, and the arch docking error is controlled within ±3mm. Integrate CAN bus control system to achieve pre-programming of arm movement trajectory, collision warning, and automatic obstacle avoidance functions. The remote monitoring platform can view equipment operating parameters in real-time, generate 3D construction logs, and support big data analysis of over excavation and under excavation.

Safety and Humanized Design
Multi-Protection System
The patented folding protective shield (CN222879688U) can be unfolded within 0.5 seconds to form a 2.5m ² anti-rockfall area. Mechanical arm hydraulic locking+electrical interlock dual safety, preventing fixture failure caused by sudden oil pipe rupture. Wireless remote control with a radius of up to 50 meters allows operators to stay away from dangerous areas on the palm face. The centralized lubrication system reduces maintenance time by 60% and is equipped with a high-altitude oxygen cabin type cab.

 

Features:

High altitude railway construction

Experience the construction of a high-altitude railway at 4300 meters on the Sichuan Tibet Railway project, achieving continuous operation with a monthly progress of arch installation that is 15% ahead of schedule.

Urban underground space

Implement the power mode in the construction of Shenzhen Metro Line 14 in urban underground spaces, ensuring noise control levels below 65dB, which meets the stringent environmental protection requirements for nighttime construction activities.

Emergency rescue scenario

In the unfortunate 2024 Gansu tunnel collapse accident, the deployment of a dual power system plays a crucial role in ensuring a seamless 72-hour uninterrupted support operation for effective emergency rescue operations.

 

Technical Parameters:

Maximum Load-bearing Capacity of The Main Arm 3000Kg
Dual Power Diesel & Electric
Max.Operating Width 25m
Maximum Load-bearing Capacity of The Auxiliary Arm 1500Kg
Transportation Dimension (L X W X H) 9200×2600×3500mm
Ground Clearance 450mm
Min.Operating Width 5m
Model Arch Installation Robot KGM12300CSG
 

Applications:

When it comes to the installation of arch structures in tunnel construction projects, the POTENTIAL/POTENCY Arch Installation Trolley (Model: KGM12300CSG) from CHINA is the ideal solution. This innovative equipment is designed to provide efficient and precise handling of arch segments, making it a valuable tool for various application occasions and scenarios.

The Arch Installation Trolley is suitable for use in the construction of tunnels, bridges, and underground passages. Its robust construction and high load-bearing capacity make it perfect for handling heavy arch segments with ease. Whether it's a small-scale tunnel project or a large infrastructure development, this trolley can meet the demands of different construction sites.

With ISO9001:2015 certification, customers can trust the quality and reliability of this product. The minimum order quantity is just 1 unit, and the price is negotiable, making it accessible for both small and large construction companies. The packaging details include options for FR or Bulk Ship, ensuring safe transit to the destination.

Customers can expect a delivery time of 45 working days, and the payment terms accepted are T/T and L/C. With a supply ability of 120 units per year, the Arch Installation Trolley is readily available to meet the demands of construction projects. The transportation dimensions (L x W x H) of 9200×2600×3500mm provide flexibility in moving the trolley to different worksites.

The main arm of the trolley has a maximum load-bearing capacity of 3000Kg, while the auxiliary arm can handle up to 1500Kg. This allows for efficient handling of arch segments of various sizes and weights. The ground clearance of 450mm and maximum operating width of 25m ensure smooth movement and operation even in challenging terrains.

 

Packing and Shipping:

Product Packaging and Shipping:

The Arch Installation Trolley is carefully packaged to ensure its safe delivery to you. The product is securely wrapped and protected with foam padding to prevent any damage during transit.

Shipping Information:

- Shipping Method: We use reputable courier services to deliver your Arch Installation Trolley to your door.

- Shipping Time: Delivery usually takes 3-5 business days, depending on your location.

- Shipping Cost: Shipping costs may vary based on your location and the quantity of trolleys ordered.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    1992

  • Total Annual:

    15000000-50000000

  • Employee Number:

    300~500

  • Ecer Certification:

    Verified Supplier

  Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...   Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...

+ Read More

Get in touch with us

  • Reach Us
  • Changsha Potency Mechanical Technology Co., Ltd.
  • No.3358 Jinyang Avenue, Liuyang Economic and Technological Development Zone, Changsha City, Hunan Province, China
  • https://www.potencymachinery.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement