Payment Terms | T/T, L/C |
Supply Ability | 1000 sets per year |
Delivery Time | 3-6 months |
Packaging Details | Nude packing with support base and with anti-collision protection |
Name | 1000mm Track Gauge Hopper Type Ballast Railway Wagons Bottom Discharge |
Application | Transport ballast for railway construction or maintenance |
Railway Gauge | 1000 mm |
Pay Load | 40 tons |
Tare weight | 18 tons |
Bogie type | Ride control three piece casting bogie |
Coupler | No.13 Coupler and ST buffer |
Design speed | 80 km/h |
Bottom doors qty | 4 |
Discharge method | By manual, bottom discharge |
Brand Name | Tieke |
Model Number | Customized |
Place of Origin | China |
View Detail Information
Explore similar products
Mineral Ballast Railway Hopper Wagons 70t Load Standard Gauge
Quick Unloading Coal Hopper Wagon Air Control 77 Cubic Meter
70 Ton Load Railway Hopper Wagons Self Discharging Coal Hopper Car
Pneumatic Unloading Ore Hopper Wagons 60t Loading Freight Train
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 1000 sets per year |
Delivery Time | 3-6 months | Packaging Details | Nude packing with support base and with anti-collision protection |
Name | 1000mm Track Gauge Hopper Type Ballast Railway Wagons Bottom Discharge | Application | Transport ballast for railway construction or maintenance |
Railway Gauge | 1000 mm | Pay Load | 40 tons |
Tare weight | 18 tons | Bogie type | Ride control three piece casting bogie |
Coupler | No.13 Coupler and ST buffer | Design speed | 80 km/h |
Bottom doors qty | 4 | Discharge method | By manual, bottom discharge |
Brand Name | Tieke | Model Number | Customized |
Place of Origin | China | ||
High Light | 1000mm Hopper Type Railway Wagons ,Hopper Type Ballast Railway Wagons ,Bottom Discharge Railway Hopper Wagons |
The 1000mm track gauge ballast wagon is designed for customers in Southeast Asia and African countries whose railway lines are 1000mm wide. It is mainly used to transport ballast for railway construction or maintenance.
Ballast is loaded from above and unloaded from below, using gravity to unload. It has a manual unloading mechanism and the opening and closing of the lower doors is carried out by turning the transmission steering wheel. The entire ballast car is equipped with four lower doors for off-track unloading.
The meter gauge ballast wagon essentially consists of the chassis, the ballast unloading device, the braking system, the coupling and damping system and the bogie.
Chassis:
The chassis is a welded steel structure without intermediate beams, consisting of chassis, side walls, end walls, funnels, etc.
The chassis is made of high-strength, low-alloy steel profile sheet Q345B from China, which is currently widely used. needed. It is used by China Railway, has superior performance and fulfills the function of loading.
Ballast discharge system:
The railcar's ballast unloading system consists of a manual control device and a transmission device. There are four (4) lower doors for. The lower doors are controlled separately by two reducers.
Hopper wagon's air brake system:
The braking system complies with Chinese railway standards, mainly composed of 120 control valve, auxiliary air cylinder, brake cylinder, brake regulator, angle cock, etc. The hand brake device adopts a chain hand wheel operated hand brake.
The bogie is a three-part bogie with control suspension made of cast steel, which has a controlled inclined wedge damping device. The main components include wheel set assembly, amplifier assembly, side frame assembly, bearing assembly, bearing adapter, base brake device, bearing spring, wedge vibration reduction, lower side bearing and other components. The performance of the bogie meets the rating requirements of GB/T5599 and the strength design meets the requirements of TB/T1335.
Name | 1000mm Track Gauge Hopper Type Ballast Railway Wagons Bottom Discharge |
Application | Transport stone slag for laying railway ballast |
Load | 40t |
Tare weight | ≤18t |
Capacity | 25 m3 |
Axle load | 17 t |
Gauge | 1000mm |
Coupler type | #13A Grade C Steel |
Coupler center height(empty) | 850 mm |
Length | 12764mm |
Bogie type | Ride control casting bogie |
Fixed axle distance | 1750mm |
Wheel diameter | 724mm |
Load method | Upper load, two sides and bottom pneumatic unloading |
Brake method | Air brake |
Brake distance | ≤1400 m |
Brake ratio | 9.6 |
Max. running speed | 120 km/h |
Min radius | 145m |
Lifespan | 25 years |
Limit gauge | Comply with Comply GB146 1-83 ‘standard gauge railway rolling stock gauge’ |
Tieke ballast hopper wagons are in service on Chinese Railway.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2016
Total Annual:
10 million-16 millon
Employee Number:
250~300
Ecer Certification:
Verified Supplier
Tongling Tieke Railway Equipment Co., Ltd (Tieke Railway) is a high tech private company transformed from a factory under Chinese Ministry of Railways in 2016. It is specialized in manufacturing, repairing, renting various railway wagons and providing various wagon spare parts for customers in indus... Tongling Tieke Railway Equipment Co., Ltd (Tieke Railway) is a high tech private company transformed from a factory under Chinese Ministry of Railways in 2016. It is specialized in manufacturing, repairing, renting various railway wagons and providing various wagon spare parts for customers in indus...
Get in touch with us
Leave a Message, we will call you back quickly!