Packaging Details | Pallet |
Delivery Time | 7-10 days after your deposit |
Payment Terms | L/C,T/T,Moneygram,Paypal,Western Union |
Supply Ability | 10000 sq.m per Month |
Shock Absorption | High |
Durability | High |
Weather Resistance | Excellent |
Color | Black |
Size | Customized |
Flexibility | High |
Warranty | 5 Years |
Installation | Easy |
Brand Name | ASHER |
Model Number | AR-SP-01 |
Place of Origin | Guangzhou, China |
Certification | SGS, ISO |
View Detail Information
Explore similar products
13mm 15mm Sandwich System Running Track High Flexibility Tartan Track
UV Proof Sandwich System Running Track Rubber Shock Absorbing Floor Mats Type
Weatherproof Field Running Track Colored 10mm Thickness Tiles Type
Elastic Sustainable Sandwich System Running Track Rubber anti UV Flooring Type
Product Specification
Packaging Details | Pallet | Delivery Time | 7-10 days after your deposit |
Payment Terms | L/C,T/T,Moneygram,Paypal,Western Union | Supply Ability | 10000 sq.m per Month |
Shock Absorption | High | Durability | High |
Weather Resistance | Excellent | Color | Black |
Size | Customized | Flexibility | High |
Warranty | 5 Years | Installation | Easy |
Brand Name | ASHER | Model Number | AR-SP-01 |
Place of Origin | Guangzhou, China | Certification | SGS, ISO |
High Light | Non Slip Sandwich System Running Track ,High Flexible Recycled Rubber Floor ,Non Slip Recycled Rubber Floor |
The construction of semi-prefabricated runways involves the use of several materials, such as the bottom adhesive layer, TPU elastic layer, silicon PU layer, and anti-slip surface layer. The latter two types of layers typically have a particulate spray surface or self-knotted grain spray surface.
The bottom adhesive layer serves to bond the elastic layer and silicon PU layer, ensuring that the entire construction can remain cohesive and maintain its integrity. The TPU elastic layer functions as a support for the overall structure, providing cushioning and shock absorption. The silicon PU layer is the topmost layer, allowing water or other liquids to run off the runway.
The anti-slip surface layer is essential to providing a secure foothold. It can either come with a particle spray surface, or with a self-knotted grain spray surface. Both kinds of surfaces create a friction-filled environment that ensures the feet remain firmly planted and that slips and falls are avoided.
The process of semi-prefabricated plastic runway construction is divided into the following steps:
Step 1: Ensure that the foundation is flat and the vertical and horizontal slopes meet the stadium's drainage requirements before pre-laying lines for the foundation of the site.
Step 2: Place the required rolls in length units of each roll within the runway line planned to be laid on the day.
Step 3: Stir the required base adhesive within one hour on the controlled site.
Step 4: Use a special cart to transport the stirred adhesive out of the required site and scrape it evenly.
Step 5: Spread the coiled material flat and longitudinally according to the line, and then compact it with a special roller.
Step 6: Prepare polyurethane elastic material on the laid TPU coiled material, mix it evenly according to the ratio strictly, and spread the surface reinforcement layer according to the required thickness.
Step 7: After the reinforcement layer is cured, mix the surface glue and glue, and use the runway sprayer to spray the surface layer on the whole site.
Step 8: After the surface layer is completely dry, demarcate the runway boundary and clean up the site.
ASHER focuses on providing semi-prefabricate running track solutions, playground running track solutions, and other related products to meet the needs of customers. Our product, the AR-SP-01 model, is manufactured from Guangzhou, China and comes with SGS and ISO certifications. With a minimum order quantity of 300sqms, the price is negotiable and the product is packaged on pallets. Delivery time is 7-10 days after the deposit is made and payment can be done by L/C, T/T, Moneygram, Paypal, or Western Union. We are confident that we can provide up to 10000sqm per month. The semi-prefabricate running track is 10mm thick and has an integrated structure with a smooth surface, thus providing high shock absorption and easy installation.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2003
Total Annual:
8000000-10000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
USA Wegi Sports Inc., founded in 2023 and headquartered in New Jersey, USA. Specializes in the production, sales, and installation of synthetic running tracks and artificial turf. We are dedicated to provide professional, durable, and safe sports surface solutions throughout the United States... USA Wegi Sports Inc., founded in 2023 and headquartered in New Jersey, USA. Specializes in the production, sales, and installation of synthetic running tracks and artificial turf. We are dedicated to provide professional, durable, and safe sports surface solutions throughout the United States...
Get in touch with us
Leave a Message, we will call you back quickly!