Supply Ability | 800tons/months |
Delivery Time | 100 working days |
Packaging Details | SEA PACKING |
Application | Boiler Walls |
Pressure Range | Up to 10MPa |
Size | Customized |
Material | Carbon Steel |
Temperature Range | Up to 600°C |
Color | Customized |
Brand Name | SANCO |
Model Number | Membrane wall |
Certification | ASME ,ISO,EN, |
Place of Origin | China |
View Detail Information
Explore similar products
ASME Certified Boiler Membrane Wall High Temperature Alloy Steel For Customized
Customizable ASTM Certified Water Wall Panels For Coal Boiler Evaporation
Customized Efficient Alloy Steel Boiler Parts Water Wall Panels Power Station
Customized Water Wall Panels Arc Welding Carbon Steel Enhancing Performance
Product Specification
Supply Ability | 800tons/months | Delivery Time | 100 working days |
Packaging Details | SEA PACKING | Application | Boiler Walls |
Pressure Range | Up to 10MPa | Size | Customized |
Material | Carbon Steel | Temperature Range | Up to 600°C |
Color | Customized | Brand Name | SANCO |
Model Number | Membrane wall | Certification | ASME ,ISO,EN, |
Place of Origin | China | ||
High Light | Carbon Steel Membrane Wall panels ,Membrane Wall Panels Boiler Solution ,Power Station boiler membrane wall |
Power Station Boiler Solution Customized Carbon Steel Membrane Wall Panels
How to inspect weld quality?
PT (surface flaws), RT (internal flaws), pneumatic pressure test.
Specifications
Name | Membrane water panel |
Material | Carbon steel,Alloy steel,etc. |
Tube size | Φ38 - 76 mm, Customization |
Standard | ISO , ASME |
Model | Studded |
Dimension | Customization |
Manufacturing process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging |
Installation location | Around the boiler combustion chamber |
Adavantages of Water Wall Panel
1.ensure the sealing of furnace wall and reduce air leakage in combustion chamber.
2.realize full water cooling in the combustion chamber, which is conducive to preventing coking under the condition of intensified combustion.
3.low heat storage capacity, fast heating and cooling of the combustion chamber, which can shorten the cooling time of the boiler starting and stopping.
4.it is suitable to use tube-laying furnace wall, which greatly reduces the load of boiler frame and facilitates suspension.
5.compared with the light pipe, the heat absorption capacity of the pipe is improved.
6.improve the pre-assembly degree of boiler components, facilitate and reduce the installation workload.
Production Description
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2024
Total Annual:
1000-2000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...
Get in touch with us
Leave a Message, we will call you back quickly!