Payment Terms | L/C, T/T |
Supply Ability | 10000 M2 per month |
Delivery Time | 20-25 days |
Packaging Details | pallets, bundles, bags, etc. |
Material | beam clamp, steel prop, Fork head |
Application | drop beam construction |
Site supervision | available |
Type | Beam formwork |
Beam height | Max. 900mm |
Supporting | Joist clamping connector, steel props |
Brand Name | HORIZON |
Model Number | Joist clamping connector |
Certification | SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Steel Prop Slab Formwork Systems , Trolley Movable Shuttering For Concrete Slab
Recyclable Table Formwork Systems Timber Beam H20 Large Spindle Range 2.5x5.0m
Flexible Slab Decking System 4.5m Height Timber Beam H20 Movable By Trolley
Versatile Floor Slab Formwork Systems EN1065 Prop For Decking Concrete
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 M2 per month |
Delivery Time | 20-25 days | Packaging Details | pallets, bundles, bags, etc. |
Material | beam clamp, steel prop, Fork head | Application | drop beam construction |
Site supervision | available | Type | Beam formwork |
Beam height | Max. 900mm | Supporting | Joist clamping connector, steel props |
Brand Name | HORIZON | Model Number | Joist clamping connector |
Certification | SGS | Place of Origin | China |
High Light | slab shuttering system ,slab scaffolding system |
Flex-H20 slab formwork is the ideal system for shuttering any slabs, including drop beams.
Drop beams are always designed in many projects, which seems troublesome and cost money while constructing such beams.
Now, HORIZON beam clamps can help reduce work and cost. The beam clamp is connected to a H20 beam by easy tightening the wing nut. The timber beam is part of the bottom shuttering of the concrete beam.
Similar as Flex-H20 slab formwork stripping, it’s very easy to strip the beam formwork.
Loose the wing nut that locking the beam clamp, move back the beam clamp and take the lateral timber beam (or wood plank). Then remove the beam clamp. Now, the beam formwork and slab formwork can be taken down separately easily.
Exactly rectangular side shuttering can be formed due to the large dimension and contact area of the two clamped side forms.
| Beam height H (cm) | Max. Distance of beam clamps | ||
Without slab (m) | With slab t=20cm (m) | With slab t=30cm (m) | ||
30 | 2.25 | 1.5 | 1.25 | |
35 | 2.00 | 1.25 | 1.00 | |
40 | 1.75 | 1.05 | 0.9 | |
45 | 1.50 | 0.95 | 0.8 | |
50 | 1.35 | 0.85 | 0.7 | |
55 | 1.30 | 0.75 | 0.60 | |
60 | 1.05 | 0.65 | 0.50 | |
65 | 0.9 | 0.50 | 0.40 | |
70 | 0.80 | 0.40 | 0.35 | |
75 | 0.60 | 0.30 | ||
80 | 0.55 | |||
85 | 0.45 | |||
90 | 0.35 |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!