Payment Terms | L/C, T/T |
Supply Ability | 20000 pcs per week |
Delivery Time | 15-25 days |
Packaging Details | pallets, bundles, bulk |
Material | Q235 steel pipe |
OEM | Available |
finishing | Electric galvanized |
Standard | EN1065 |
Size | prop 20-350 |
Application | for supporting slab formwork |
Load capacity | 20KN at top height |
Brand Name | HORIZON |
Model Number | Steel prop 20-350 |
Certification | SGS |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Floor Adjustable Support Props 2.5-4.0m Cup Type Nut For Building Construction
High Load Capacity Scaffolding Steel Props
Q235 Steel Pipe Adjustable Telescopic Steel Props 3.5 M Height For Slab Formwork
Telescopic Length Scaffolding Steel Prop , Adjustable Steel Builders Prop 30KN
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 20000 pcs per week |
Delivery Time | 15-25 days | Packaging Details | pallets, bundles, bulk |
Material | Q235 steel pipe | OEM | Available |
finishing | Electric galvanized | Standard | EN1065 |
Size | prop 20-350 | Application | for supporting slab formwork |
Load capacity | 20KN at top height | Brand Name | HORIZON |
Model Number | Steel prop 20-350 | Certification | SGS |
Place of Origin | CHINA | ||
High Light | push pull props ,adjustable telescopic steel props |
Typical Steel Prop 20-350 for Table Form and Flex-H20 Slab Formwork Shoring
The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.
Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props, which result in safe and efficient use on sites.
The manufacture of Telescopic Props is certified in accordance with standard EN 1065.
Specification | Capacity (KN) | Height (mm) | Dia (mm) | Weight (Kg) |
HZP30-300 | 30 | 1650-3000 | 76/63 | 20.9 |
HZP30-350 | 30 | 1970-3500 | 76/63 | 23.0 |
HZP30-400 | 30 | 2210-4000 | 76/63 | 25.0 |
HZP20-300 | 20 | 1650-3000 | 60/48 | 15.7 |
HZP20-350 | 20 | 1970-3500 | 60/48 | 16.6 |
HZP20-450 | 20 | 2460-4500 | 60/48 | 28.2 |
HZP20-500 | 20 | 2710-5000 | 60/48 | 30.5 |
Important Instructions:
• Respect the prop spacing in accordance with the project.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!