Payment Terms | Western Union, T/T, L/C, MoneyGram |
Supply Ability | 5000000 pcs per year |
Delivery Time | 35days |
Packaging Details | Standard Package |
Application | Industrial |
Accuracy Class | Active: CL1.0 Reactive: CL2.0 |
Measurement | Active & Reactive Energy |
Start Current | 0.4% Ib |
Voltage Loop Consumption | ≤1.5W (5VA) |
Current Loop Consumption | ≤1VA |
Brand Name | Radarking |
Model Number | DTZY150 |
Certification | IEC62053-21; IEC62052-11; IEC62056-21 |
Place of Origin | Made In China |
View Detail Information
Explore similar products
Single Phase Smart Electric Meters for Automatic Remote Reading System with GPRS
Single Phase Smart Electric Meters Smart Card Prepaid Watt Hour Energy Meter PLC
CPU Card Smart Electric Meters Single Phase Multi Function Smart Meter for AMR
IC Card Smart Electric Meters Single Phase Prepaid Electronic Meter with Multi
Product Specification
Payment Terms | Western Union, T/T, L/C, MoneyGram | Supply Ability | 5000000 pcs per year |
Delivery Time | 35days | Packaging Details | Standard Package |
Application | Industrial | Accuracy Class | Active: CL1.0 Reactive: CL2.0 |
Measurement | Active & Reactive Energy | Start Current | 0.4% Ib |
Voltage Loop Consumption | ≤1.5W (5VA) | Current Loop Consumption | ≤1VA |
Brand Name | Radarking | Model Number | DTZY150 |
Certification | IEC62053-21; IEC62052-11; IEC62056-21 | Place of Origin | Made In China |
High Light | domestic electric meter ,digital smart meter |
RF/GPRS Three Phase Smart Electric Meter for AMR System with DLMS/COSEM Protocol
Main Features:
● Energy Measurement
Total and time-sharing forward active & reactiveenergy measurement
Total and time-sharing reverse active & reactive energymeasurement
Total forward & reverse apparent energy measurement
Save last one to sixteen months energy data
● Max. Demand Measurement
Measure total and time-sharing forward active &reactive maximum demand and time of occurred
Measure total and time-sharing reverse active &reactive maximum demand and time of occurred
Measure total forward & reverse apparent maximumdemand and time of occurred
● Real Time Measurement
Real-time measurement of the phase voltage, current,total active power,
reactive power, apparent power, total power factor, powergrid frequency
● TOU
4tariffs, 100holidays, 14season‐tables, 8time zone‐tables, each table onmaximum 14 time zones
● Event Log
The last 10 records of following events:Power-down,Programing, Cover opening, Terminal cover opening, Reverse power,
PhaseFail.the records include data and time
● Loadprofile
At least 4 loadprofile channels,Recordat least 490days data when time interval is 30 minutes
● Optical port interface
Support IEC62056-21protocol, 1200bps for communication
● RS-485 serial interface
SupportIEC62056(DLMS/COSEM) protocol, 2400bps for communication
● LCD display
Number of digits value field Up to 8
Digit size 6x14.5mm
● Inputs and outputs
Optical test outputs active energy and reactive energy
● Communication modules(optional)
GPRS module:EGSM900/DCS1800 dual-band,support GSM/GPRSphase2/2+ protocol
PLC module: according to Technology Standards of SSC163X ,centerfrequency 270K, FSK modulate technolgy
Main Parameter:
Item | Specification | |
Reference Current | 1.5(6)A 5(40)A 5(60)A 15(60)A 20(100)A | |
Reference Voltage | 3×220V/380V | |
Dimension (mm) | 290×170×85 | |
Working Voltage Range | 0.8Un~1.15Un | |
Maximum Working Voltage | 0.7Un~1.2Un | |
Working Temperature | -25℃~+60℃ | |
Maximum Working Temperature | -40℃~+70℃ | |
Accuracy | Active 1.0 | Reactive 2.0 |
Factory setting subject to nameplate | ||||||||
For 1.5(6)A meter: Active | 6400imp/kW·h | |||||||
Reactive | 6400imp/kvar·h | |||||||
For 5(40)A meter: Active | 600imp/kW·h | |||||||
Constant | Reactive | 600imp/kvar·h | ||||||
For 5(60)A /15(60)A meter: Active | 400imp/kW·h | |||||||
Reactive | 400imp/kvar·h | |||||||
For 20(100)A | meter: | Active | 300imp/kW·h | |||||
Reactive | 300imp/kvar·h | |||||||
Pulse Width | (80±20)ms |
Safety precautions:
* Use only isolated tools.
* Place the meter only in dry surroundings.
* Make sure the used wires are suitable for the max current the meter can measure.
* Make sure the AC wires are installed correctly before activating the current/voltage.
* Do not touch the meter connecting clamps directly with your bare hands, with metal, blank wire or other material as you will have the chance of an electricity shock and a possible chance for health damage.
* Make sure the protection cover is placed after installation and has been sealed.
* Installation, maintenance and repair should only be done by a certified electrician.
* Never break the seals or open the front cover as this might influence the functionality of the meter.
* Do not through, drop, kick or other physical violence to the meter as there are high precision components inside that will break or make the meter measure inaccurate.
* Do not mount the meter in area's with harm gas, dust, mildew or insects or on unstable surfaces.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
10000000-15000000
Employee Number:
100~200
Ecer Certification:
Active Member
Introduction: Wuhan Radarking Electronics Corp. is a modern share enterprises which focusing on the smart Internet of things(IOT) /smart grid energy consumption sensor/intelligent electric safety integrated solution. It established in 2002(former name: Wuhan Radarking Co.,Ltd.)and went publ... Introduction: Wuhan Radarking Electronics Corp. is a modern share enterprises which focusing on the smart Internet of things(IOT) /smart grid energy consumption sensor/intelligent electric safety integrated solution. It established in 2002(former name: Wuhan Radarking Co.,Ltd.)and went publ...
Get in touch with us
Leave a Message, we will call you back quickly!