Payment Terms | Western Union, T/T, L/C |
Supply Ability | 8000houses/year |
Delivery Time | 30-45 working days |
Packaging Details | 40HQ |
Insulation material | EPS/XPS/PU sandwich panel or glass wool |
main materials | Light Gauge Steel |
Other fittings | toilet,washbasin,shower,kitchen etc. |
Ceiling material | MGO board/gypsum board |
Use | Hotel, House, Office, Shop, Villa, Workshop,Plant, Other |
color | option |
Brand Name | DEEPBLUE SMARTHOUSE |
Model Number | Hutong Yard |
Certification | CE ,ISO,N/Z |
Place of Origin | NINGBO,CHINA |
View Detail Information
Explore similar products
Energy Saving Affordable Prefab House Steel Structure Villa Prefabricated Villas
Prefabricated House , Light Steel Modular Villa , Portal Frame Buildings
House Prefabricated , High Insulation Villa With PVC Sliding Windows
CE Certificate Prefab Steel House , Light Steel Structure House Villa
Product Specification
Payment Terms | Western Union, T/T, L/C | Supply Ability | 8000houses/year |
Delivery Time | 30-45 working days | Packaging Details | 40HQ |
Insulation material | EPS/XPS/PU sandwich panel or glass wool | main materials | Light Gauge Steel |
Other fittings | toilet,washbasin,shower,kitchen etc. | Ceiling material | MGO board/gypsum board |
Use | Hotel, House, Office, Shop, Villa, Workshop,Plant, Other | color | option |
Brand Name | DEEPBLUE SMARTHOUSE | Model Number | Hutong Yard |
Certification | CE ,ISO,N/Z | Place of Origin | NINGBO,CHINA |
High Light | steel frame houses ,steel building houses |
Personalized Light Steel Prefab Metal Homes Earthquake Proof 100 Years Life Chinese Style House
Quick Detail:
Name | Chinese style holiday villa house | Application | for living ,for rent , for holiday |
Color | according to the customer’s request | Feature | 1.U.K engineer approved; 2.Earthquake, cyclone and fireproof; 3.100years life; 4.Green, Energy save |
Material | light steel frame and other parts materials | Certificate | CE,ISO,SAA,ETC |
the installation process is as simple as 16 easy to follow steps :
1. house design 2.frame production 3.frame assembling 4.frames storage 5.frames transportation
6.frames on-site 7.foundation 8.ground floor assemble 9.joint frame assembly 10.2F flooring installation
11. 2F frame installation 12.Trusses installation 13.roofing installation 14.exterior wall installation 15.interior wall installation 16.interior decoration
The advantage of the light steel structure :
1) Lifetime for structure: 100 years.
2) Earthquake resistance: mix more than 8 grades.
3) Wind resistance: max 60m/s.
4) Fire resistance: all the materials used can be fire-resistant.
5) Snow resistance: max 2.9KN/m²as required
6) Heat insulation: 100 mm in thickness can match 1 m thickness of the brick wall.
7) High acoustic insulation: 60db of exterior wall 40db of interior wall
8) Insect prevention: free from the damages by insects, such as white ants
9) Ventilation: a combination of natural ventilation or air supply keep the indoor air fresh and clean
10) Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorating materials.
11) Installation: the average is one worker one day install one SQM.
12) Installation guide: dispatch engineer to guide on site.
Design code :
1) AISI S100 North American Specification for the Design of Cold-Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.
2) AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.
3) BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for the design of cold-formed thin gauge sections published by BSI in the UK.
4) ENV1993-1-3 means Euro code 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.
product plan:
We frame it.
DEEPBLUE uses a state-of-the-art computer-aided design with cold form steel production. We create engineered steel frame designs that are sent to the roll-forming machine to press, cut, and penalized. The process is clinical, fast, and virtually waste-free.
You finish it.
The steel frames are shipped as panels across the world. With a foundation to anchor them on, a completed frame is typically assembled and anchored in a day, leaving you with a stronger, lighter frame that puts time back into your build.
Company Details
Business Type:
Manufacturer,Exporter,Seller,Other
Year Established:
2009
Total Annual:
10000000-30000000
Employee Number:
200~1000
Ecer Certification:
Verified Supplier
Since David Chen first opened our doors in 2009, we have been proud to provide light gauge steel framing system, prefab homes,light steel house, luxury villa, tiny house, townhouse, prefab house, prefab apartments, prefab commercial buildings, military barracks, prefabricated dwelling an... Since David Chen first opened our doors in 2009, we have been proud to provide light gauge steel framing system, prefab homes,light steel house, luxury villa, tiny house, townhouse, prefab house, prefab apartments, prefab commercial buildings, military barracks, prefabricated dwelling an...
Get in touch with us
Leave a Message, we will call you back quickly!