Payment Terms | T/T |
Supply Ability | 10000 tons/month |
Delivery Time | 20-30 works days |
Packaging Details | Exported standard packing |
Product Insulation | Thermal Insulation |
Working Scope | Design,Fabrication, Installation |
Sustainability | Eco-friendly |
Key | Versatility |
Insulation | Efficient |
Product Flexibility | Flexible |
Window | Aluminum Sliding Window |
Features | Steel Frame Warehouse |
Brand Name | YDX |
Model Number | YDX-S5 |
Certification | CE ISO SGS |
Place of Origin | CHINA,QINGDAO |
View Detail Information
Explore similar products
Wide Span Steel Frame Building Construction Prefab Metal Storage Buildings
Fast Assemble Steel Frame Warehouse Prefabricated Steel Warehouse Buildings
Lightweight Prefab Small Buildings Industrial Commercial Easy Transport
Fast Construction Steel Frame Building Construction With Aluminum Or Steel Wood
Product Specification
Payment Terms | T/T | Supply Ability | 10000 tons/month |
Delivery Time | 20-30 works days | Packaging Details | Exported standard packing |
Product Insulation | Thermal Insulation | Working Scope | Design,Fabrication, Installation |
Sustainability | Eco-friendly | Key | Versatility |
Insulation | Efficient | Product Flexibility | Flexible |
Window | Aluminum Sliding Window | Features | Steel Frame Warehouse |
Brand Name | YDX | Model Number | YDX-S5 |
Certification | CE ISO SGS | Place of Origin | CHINA,QINGDAO |
High Light | steel warehouse building with insulation ,thermal insulated steel structure building ,aluminum window steel frame warehouse |
Steel Structure Warehouse Building Construction Large Span Easy Assemble
Project Description:
Steel Structure Warehouse Building Construction Large Span Easy Assemble. This is a heavy steel structre warehouse project that we are awarded as a General Contractor, that means our work scope include design, fabrication and construction. The construction floor area is about 39,700 square meters. As it is a heavy steel warehouse, the steel quantity for this project is about 3000Tons. We provide wleded steel beam&column, roof and wall panel, purlin, window and doors and other accessory.All components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
Product Description:
Product Application | |||
Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse | |||
A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding! | |||
An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework. | |||
SPECIFICATION FOR STEEL STRUCTURE BUILDING | |||
Main Steel Frame | Steel Column & Beam | 1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel | |
2. Surface: Hot Dip Galvanized or Painted; | |||
3. Connection: All Bolts Connection; | |||
Supporting System | Roof Purlin | C or Z Section Steel, Q235B | |
Wall Purlin | C or Z Section Steel, Q235B | ||
Bracing | Steel Rod, Q235B | ||
Cross Support | Steel Rod, Q235B | ||
Column Support | Angle Steel; Steel Rod; Q235B | ||
Angle Brace | Angle steel,Q235B | ||
Tie Bar | Steel Pipe,Q235B | ||
Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm | ||
2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm; | |||
Accessories | Door | Sliding; Rolled Up Door (Manual/Auto) | |
Window | Aluminum Alloy; PVC; | ||
Downspout | PVC pipe; | ||
Gutter | Galvanized Steel Sheet; Stainless Steel | ||
Ventilator | Stainless Steel Turbine Ventilator | ||
Skylight Belt | FRP or PC semi-transparent Skylight Belt | ||
Flash | Color Steel Sheet | ||
Fittings | Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc |
Our steel structure fabricaiton factory:
We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.
Installation:
Method 1: We provide shop drawing before installation.
Method 2: If you still don't know how to install, We will teach you the installation in our factory. when necessary , we will assemble a sample steel structure building for you.
Packing & Loading:
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
How to quote:
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
1000-2000
Employee Number:
56~100
Ecer Certification:
Verified Supplier
Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee... Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee...
Get in touch with us
Leave a Message, we will call you back quickly!