Payment Terms | T/T |
Supply Ability | 10000 tons/month |
Delivery Time | 20-30 works days |
Packaging Details | Exported standard packing |
Drawing | CAD, TEKLA, 3D Model, PKPM, BIM |
Connect | Bolt/Weld |
Speed Of Construction | Fast |
Corrosion Resistance | High |
Cladding | PU/Rock Wool/Fiberglass/EP |
Windows | Aluminum |
Product Flexibility | Flexible |
Apply | Easy to Apply |
Design | Custom For Free |
Frame Type | Steel Frame |
Installation Time | Faster construction time |
Installation | Engineer Guidance On Site |
Shape | As The Customer Request |
Door | Aluminum Or Steel Wood Door |
Brand Name | YDX |
Model Number | YDX-D4S |
Certification | CE ISO SGS |
Place of Origin | CHINA,QINGDAO |
View Detail Information
Explore similar products
Wide Span Steel Frame Building Construction Prefab Metal Storage Buildings
Fast Assemble Steel Frame Warehouse Prefabricated Steel Warehouse Buildings
Lightweight Prefab Small Buildings Industrial Commercial Easy Transport
Fast Construction Steel Frame Building Construction With Aluminum Or Steel Wood
Product Specification
Payment Terms | T/T | Supply Ability | 10000 tons/month |
Delivery Time | 20-30 works days | Packaging Details | Exported standard packing |
Drawing | CAD, TEKLA, 3D Model, PKPM, BIM | Connect | Bolt/Weld |
Speed Of Construction | Fast | Corrosion Resistance | High |
Cladding | PU/Rock Wool/Fiberglass/EP | Windows | Aluminum |
Product Flexibility | Flexible | Apply | Easy to Apply |
Design | Custom For Free | Frame Type | Steel Frame |
Installation Time | Faster construction time | Installation | Engineer Guidance On Site |
Shape | As The Customer Request | Door | Aluminum Or Steel Wood Door |
Brand Name | YDX | Model Number | YDX-D4S |
Certification | CE ISO SGS | Place of Origin | CHINA,QINGDAO |
High Light | custom steel frame building ,steel frame activity center ,fast construction steel building |
Portal Steel Frame Structure Building For Activity Center
Project Introduction:
Welded H section steel beams and columns are connected by high strength bolts to be the main steel frame structure. Clean span that without center column could provide large space. Double row windows light up inside. Environmental epoxy floor coating has better dustproof property and makes the floor smooth. It also has a double storeys office building inside.
Project Details:
Steel structure building | ||||
1. Primary Framing | Box beam column, cross steel column, H-shaped steel column, steel beam | |||
2. Secondary Framing | Galvanized Z and C sections purlin | |||
3. Roof and Wall panels | Steel sheet and insulated sandwich panels (EPS, fiberglass wool and PU). | |||
4. Steel Decking Floor | Galvanized steel decking board | |||
5.Structural subsystem | Divider, gutter, awning, partition wall | |||
6.Mezzanines, Platforms | Painted or galvanized H beam | |||
7.Other Building Accessories | Sliding doors, roll up doors, aluminium windows, louvers, etc. | |||
Service Life | 50-70years | support | steel angle, steel pipe, steel round | |
Place of Origin | Qingdao,Shandong,China | Application | workshop, warehouse, poultry house,garage etc | |
Grade | Q235B, Q355B or as per customer's need | Bolt Grade | M20, M16, M14 etc | |
Connection | intensive bolt, ordinary bolt | Window | PVC steel or aluminum alloy | |
Downspout | PVC pipe or as per customer's request | Door | sliding or rolling door | |
Purlin | C/Z shape profile | Panel | EPS/PU/fiber glass/rock wool | |
Main Frame | Welded or hot rolled H-shaped steel, columns, beams, box beams and columns | |||
Drawings & Quotation: | ||||
(1) Customized design is welcomed. | ||||
(2) In order to promise an accurate quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
Product Application | |||
Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse | |||
A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding! | |||
An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework. | |||
SPECIFICATION FOR STEEL STRUCTURE BUILDING | |||
Main Steel Frame | Steel Column & Beam | 1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel | |
2. Surface: Hot Dip Galvanized or Painted; | |||
3. Connection: All Bolts Connection; | |||
Supporting System | Roof Purlin | C or Z Section Steel, Q235B | |
Wall Purlin | C or Z Section Steel, Q235B | ||
Bracing | Steel Rod, Q235B | ||
Cross Support | Steel Rod, Q235B | ||
Column Support | Angle Steel; Steel Rod; Q235B | ||
Angle Brace | Angle steel,Q235B | ||
Tie Bar | Steel Pipe,Q235B | ||
Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm | ||
2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm; | |||
Accessories | Door | Sliding; Rolled Up Door (Manual/Auto) | |
Window | Aluminum Alloy; PVC; | ||
Downspout | PVC pipe; | ||
Gutter | Galvanized Steel Sheet; Stainless Steel | ||
Ventilator | Stainless Steel Turbine Ventilator | ||
Skylight Belt | FRP or PC semi-transparent Skylight Belt | ||
Flash | Color Steel Sheet | ||
Fittings | Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc |
Advantages of prefabricated steel structure buildings:
1 | High strength and light weight | Although the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span. |
2 | Good plasticity and good toughness | The plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads. |
3 | High degree of industrialization in production | The steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high. |
4 | Simple construction and short construction period | All components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period. |
5 | Wind resistance and structural stability | Steel structure construction with light weight, high strength, good overall rigidity and strong deformation ability |
6 | Saving construction costs | The steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure. |
7 | Recyclable | Steel can be recycled, less environmentally polluted when constructed and removed |
Packaging and Transportation:
The Customer Gave a High Praise:
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
1000-2000
Employee Number:
56~100
Ecer Certification:
Verified Supplier
Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee... Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee...
Get in touch with us
Leave a Message, we will call you back quickly!