China factories

China factory - Sussman Machinery(Wuxi) Co.,Ltd

Sussman Machinery(Wuxi) Co.,Ltd

  • China,Wuxi ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Hydraulic Punching 2 Layer Steel Roll Forming Machine 0.25-0.8mm Thickness
China Hydraulic Punching 2 Layer Steel Roll Forming Machine 0.25-0.8mm Thickness

  1. China Hydraulic Punching 2 Layer Steel Roll Forming Machine 0.25-0.8mm Thickness
  2. China Hydraulic Punching 2 Layer Steel Roll Forming Machine 0.25-0.8mm Thickness

Hydraulic Punching 2 Layer Steel Roll Forming Machine 0.25-0.8mm Thickness

  1. MOQ: 1 set
  2. Price: USD 15,000-33,500 per set
  3. Get Latest Price
Supply Ability 5 sets per month
Delivery Time 90-120 days
Packaging Details standard film
Material thickness 0.25-0.8mm, coil width 1220 and 1000mm
Forming Speed 8-12 m/min
Material of Roller 45# steel, coated with chrome quenching
Material of Shaft Ф76 45# steel, coated with chrome
Hydraulic cutting Power 4kw
Tolerance 1.5mm
Brand Name Sussman
Model Number CT-RF-056
Certification CE, SGS, ISO
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 5 sets per month Delivery Time 90-120 days
Packaging Details standard film Material thickness 0.25-0.8mm, coil width 1220 and 1000mm
Forming Speed 8-12 m/min Material of Roller 45# steel, coated with chrome quenching
Material of Shaft Ф76 45# steel, coated with chrome Hydraulic cutting Power 4kw
Tolerance 1.5mm Brand Name Sussman
Model Number CT-RF-056 Certification CE, SGS, ISO
Place of Origin China
High Light Slip Roll Forming MachineAutomatic Vacuum Forming Machine

 

Hydraulic Punching 2 Layer Steel Roll Forming Machine 0.25-0.8mm Thickness

 

Technical Data

 

Number Items UnitType RF-DL
1 Steel Thickness mm 0.25-0.8mm, coil width 1220 and 1000mm
2 Forming Speed m/min 8-12
3 Roller stands stand 18 stands bottom layer; 18 stands top layer
4 Roller Material mm 45# steel, coated with chrome quenching
  Shaft material and diameter mm Ф76 45# steel, coated with chrome
5 Main Motor Power Kw 7.5
6 Hydraulic cutting Power Kw 4
7 Hydraulic pressure Mpa 12
8 Power Supply   220V, 60HZ,3 phase
9 Tolerance mm 1.5
10 Material of cutting   Cr12mov HRC60-62
11 Control system   PLC with touch screen
12 Machine net weight T 8


 

 

Machine process:

 

Uncoiling—Feedingwithguide—Roll forming—Cutting—Products collecting

 

 

Profiles:

 

 

Punching Moulds description:

 

As for the profiles, total need 2 sets of punching moulds, when need to punching the first hole drawing, change the punching mould 1, when punching the second hole drawing, change the punching mould 2, ect. When the punching heads broke, they can be removed, and changed by the new punching heads.

Punching moulds material: Cr12Mov Quenching HRC58-62degree Shanghai NO.5 Steel (China best brand for steel)

 

 

 

Installation of the machine :

The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:

- Installation by Sussman service technicians.

- The following services are included:

- Installation of the machine components.

- Adjustment of the machine components.

- Connection of all motors to the control cabinet.

- Installation of the required safety devices.

Delivery extent does not comprise of:

- Media supply (electrics, etc.)to the machine(control cabinet)

- Raw material process material

- Raw material for test

- Transport and lifting devices

- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.

 

Commissioning of the machine:

The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:

- Commissioning by Sussman service technicians

- Training at the machine

- The following services are rendered

- Run up of the machine components

- Testing of all functions of the machine components

- Start of a fully automatic molding process

- Execution of machine acceptance

Delivery extent does not comprise of:

- Raw materials, process materials and consumables

- Raw material for test

- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

 

Our After-Sales Service Commitments:

Sussman hereby solemnly promises: We implement the “three guarantees” service policy for any equipments sold by Sussman, provide free of charge installation guidelines, commissioning and maintenance of the equipments, training of the Buyer’s relevant Operators; and provide technical requirements for the installation and operation of the equipments, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts

The detailed measures are as follows:

1.Guidelines for installation and commissioning of equipments:

Based on the actual situation, to assist and guide the Buyer and Buyer’s technical personnel in the overall installation location, the installation of equipments, and provide Buyer with answers to their questions and related issues;

 

2.Provide training for operation and maintenance personnel:

Based on the Buyer’s request, Sussman will provide free of charge training of the operation and maintenance personnel;

a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;

b) When Sussman is doing the installation and test running of the equipments for the Buyer, the Buyer can send their personnel to participate.

 

3.If failure occurs in any of the machines during the “three guarantees” period(one year), three guarantees including the electricity parts, the rolls, the shafts and punching& cutting moulds, then, upon the Buyer’s request, Sussman will eliminate the failure;

 

4. Sussman will inform all its Buyers about any upgrades and significant product improvements. Sussman will provide equipment modifications based on their costs. Sussman will provide Buyers with high-quality after-sales services in a careful and responsible attitude, provide very strong guarantee for the Buyer’s normal production.

We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter

  • Year Established:

    2008

  • Total Annual:

    150million -300million

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

    The main products of factory is light gauge framing machine, pre-painted steel forming machine, Glazed Tile forming machine, Automatical C/Z Purlin forming machine, Floor Deck forming machine, Guardrail forming machine, Down Pipe forming machine, The whole carriage plate for ...     The main products of factory is light gauge framing machine, pre-painted steel forming machine, Glazed Tile forming machine, Automatical C/Z Purlin forming machine, Floor Deck forming machine, Guardrail forming machine, Down Pipe forming machine, The whole carriage plate for ...

+ Read More

Get in touch with us

  • Reach Us
  • Sussman Machinery(Wuxi) Co.,Ltd
  • NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
  • https://www.steel-rollformingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement