China factories

China factory - Yixing Boyu Electric Power Machinery Co.,LTD

Yixing Boyu Electric Power Machinery Co.,LTD

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Cummins Engine Hydraulic Cable Tensioner Transmission Line Construction
China Cummins Engine Hydraulic Cable Tensioner Transmission Line Construction

  1. China Cummins Engine Hydraulic Cable Tensioner Transmission Line Construction
  2. China Cummins Engine Hydraulic Cable Tensioner Transmission Line Construction

Cummins Engine Hydraulic Cable Tensioner Transmission Line Construction

  1. MOQ: 1set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 100sets/month.
Delivery Time 15~25 days
Packaging Details Container
Product type Tension Machine For Transmission Line Construction
Maximum continuous tension 120KN
Total weight 8100kg
Groove numbers 15
Maximum back pulling force 90kn
Maximum payoff speed 5km/h
Brand Name BOYU
Model Number TY1x120III
Certification ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 100sets/month.
Delivery Time 15~25 days Packaging Details Container
Product type Tension Machine For Transmission Line Construction Maximum continuous tension 120KN
Total weight 8100kg Groove numbers 15
Maximum back pulling force 90kn Maximum payoff speed 5km/h
Brand Name BOYU Model Number TY1x120III
Certification ISO9001 Place of Origin China
High Light cummins engine hydraulic cable tensionertransmission line construction hydraulic cable tensionercummins engine hydraulic wire tensioner

Cummins Engine Tension Machine For Transmission Line Construction Max Back Pulling Speed 3km/h

 

Main technical performance Maximum intermittent tension 130KN
  Maximum continuous tension 120KN
  Corresponding speed 2.5km/h
  Maximum payoff speed 5km/h
  Corresponding tension 60KN
  Maximum back pulling force 90kn
  Maximum back pulling speed 3km/h
  Diameter of tensile force wheel 1500mm
  Groove numbers 15
  Maximum applicable diameter of wire 40mm
  Transport dimensions Length: 5300mm
    Width: 2300mm
    Height: 2600mm
  Total weight 100kg
 
Engine Model Cummins 4BTA3.9-C130
  Rated power 97kw/2500rpm
 
Transmission System With closed double-loop hydraulic transmission system and planet decelerator, tension wheel is driven by primary gear. With inversion, the magnitude of reverse traction force is led by exit pressure of pump. In tension condition, hydraulic motor rotation is driven by the tension wheel; the magnitude of tension is controlled by regulating the motor exit pressure.
Main pump Type Hydraulic control bidirectional variable plunger pump(Germany Rexroth)
  Model A4VG71EP4/32R
Hydraulic motor Type Two-way Quantitative Plunger Piston Motor (Germany Rexroth)
  Model A2FM180/61W
Speed reducer Type planet Gear Decelerator (Italy Bonfiglioli)
  Model 310 L2
  Reduction ratio 28
  Brake opening pressure 1.8MPA
 
Electrical System System voltage 24V
  Storage battery 6-QA-110(2 sets)
  Diesel engine starting 24V electric starting

 

 

Operate Accord to the Followed Order when Starting

1. After fixed the tension machine, open the “power” switch, pull the start switch to start diesel engine and observe whether the index on the displays is normal.

2. Put all the control handles in the control box in starting position, including:

(1) Put engine throttle in minimum position (idle speed).

(2) Rotate the knob “PULLING HANDLE” to median position, that is position of “TENSION”.

(3) Loosen all the “TENSION REGULATIONT” ” REGULATION OF REEL WINDER PRESSURE”.

(4) Rotate the knob “BRAKE” to the position of “Brake”.

3. Keep the engine in idle speed for 1-2 minutes after starting and observe whether the displays of the instruments are normal at the same time. Pay attention that the index of "BEAKE PRESSURE" can’t be lower than 1.8MPa or higher than 2.5MPa; Otherwise, it is necessary to stop the machine for inspection.

4. Within 10 seconds, if the engine failed to start, the knob should be released immediately and started for a second time after one minute. If it couldn’t start three times in a row, it should be stopped and the operators must find out the reasons, debug them and start later.

5. When delivering under tension, the brake should be released at first. The method is as following: Rotate "Brake" to "Release" position, observe whether the readings of "Brake Pressure" are not less than 3.5Mpa, if the brake pressure had declined, it needs shutdown inspection.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    1997

  • Total Annual:

    15000000-20000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Established in 1993, Yixing Boyu Electric Power Machinery Co., Ltd. is a manufacturer specialized in the research, development and production of Electric Power Machinery, CE certified. We are located in beautiful and rich city: Yixing city. We are a High-tech enterprise in Jiangsu Province, with ... Established in 1993, Yixing Boyu Electric Power Machinery Co., Ltd. is a manufacturer specialized in the research, development and production of Electric Power Machinery, CE certified. We are located in beautiful and rich city: Yixing city. We are a High-tech enterprise in Jiangsu Province, with ...

+ Read More

Get in touch with us

  • Reach Us
  • Yixing Boyu Electric Power Machinery Co.,LTD
  • https://www.stringingequipments.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement