China factories

China factory - Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China ST 180 Borehole Deep Water Well Drilling Rig Yuchai Engine Rubber Crawler
China ST 180 Borehole Deep Water Well Drilling Rig Yuchai Engine Rubber Crawler

  1. China ST 180 Borehole Deep Water Well Drilling Rig Yuchai Engine Rubber Crawler
  2. China ST 180 Borehole Deep Water Well Drilling Rig Yuchai Engine Rubber Crawler

ST 180 Borehole Deep Water Well Drilling Rig Yuchai Engine Rubber Crawler

  1. MOQ: Negotiation
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 2000 units a month
Delivery Time Within 7-12 days
Packaging Details Wooden box
Product Name ST 180 Pneumatic Water Well Drilling Rig
Drill depth 180 meters
Diameter Customized Hole Diameter
Power Type Diesel Engine
Color Yellow,Red or as your rquest
Application Water Well Drilling
Drilling angle 90 ~75°
After-sales service provided Video technical support,
Warranty 24 months
OEM wheels or crawler mounted
Voltage Diesel Engine Driven
Brand Name Shitan
Model Number ST 180
Certification ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 2000 units a month
Delivery Time Within 7-12 days Packaging Details Wooden box
Product Name ST 180 Pneumatic Water Well Drilling Rig Drill depth 180 meters
Diameter Customized Hole Diameter Power Type Diesel Engine
Color Yellow,Red or as your rquest Application Water Well Drilling
Drilling angle 90 ~75° After-sales service provided Video technical support,
Warranty 24 months OEM wheels or crawler mounted
Voltage Diesel Engine Driven Brand Name Shitan
Model Number ST 180 Certification ISO9001
Place of Origin China
High Light Yuchai Engine Water Well Drilling RigYuchai Engine crawler mounted drilling rigBorehole Deep Water Well Drilling Rig

ST 180 Borehole Deep Water Well Drilling Rig Machine 

 

Product Decription

 

ST 180 is a water and air drilling rig . It is mainly suitable for drilling water wells,agricultural irrigation wells, geothermal air conditioning holes and other wells, especially suitable for water intake projects inmountainous areas and rock formations.

.

Product Technical Parameters

 

Overall weight (T ) 4.2
Dimension (mm ) 3800*1700*2350
Drilling diameter (mm ) 130-294
Drilling depth (m ) 220
One-time advance length of the drill(mm) 3000
Traveling speed (km/h ) 2.5
Climbing ability (max )
30
Minimum Ground Clearance (mm) 250
Working Air Pressure (mpa ) 1.7-2.5
Air consumption I Pl3Zrain) 15-27
Main machine power (kw) Yunnei 60Kw
Rotary Speed (rpm) 48 - 70
Rotary torque (Nm ) 4200-5600


Product Main Features

 

1. Equipped with Yuchai-powered four-cylinder Guosan engine, which ensures that the impact of emissions on the environment while the machine is operating is minimized to the most environmentally friendly level.

2.The use of dual-motor rotation increases the turning torque up to 8500N.m The drilling of water wells at the same time protects the environment and has stronger environmental adaptability.

3.These series water well drilling rigs are equipped with Kaishan LGCY series or KSCY series portable diesel screw air compressors. The rotor of 4.Kaishan compressor is directly driven, no speed gear, lower speed and higher efficiency, so the compressor can continue to be mechanical The equipment provides stable and efficient power and supports the rig work in a high-speed and stable manner.

 

Shitan Machinery FAQ

 

Q1.What is the main function of our hydraulic tricycle tractor water well drilling rig?

Ans.: It has different models used for all kinds of hole diameter and depth, it is the best choice for drilling works.
Q2. What is your terms of payment?
Ans.: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. How about your delivery time?
Ans.: Generally, it will take 7 -10 working days after receiving your advance payment. 
Q4.What is the warranty of our machine?
Ans.:Our main machine enjoys a 1 year warranty, during this time all accessories broken can be changed for a new one.

And we provide videos for machine install and operation.
Q5. What is your terms of packing?
Ans.:Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.
Q6. Do you test all your goods before delivery?
Ans.: Yes, we have 100% test before delivery.And we will attach our inspect report for every machine.
Q7.Do you Preferred provide wear parts for transacted clients?
Ans.: Yes, we have record s for your clients, and will prefer providing accessories to clients.

 

Drilling Rig Maintenance 

 

1. Pay attention to check whether the bolts and nuts of water and gas pipelines and various accessories of the drilling rig are firm at any time

2. . Always check the lubricating oil condition of the wind motor

3. . When the working face is immersed in water, a large-diameter drill head shall be used to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole

4. . The drilling rig is not allowed to reverse during drilling operation, so as to prevent the drill pipe from falling into the hole

5.. When the drilling rig stops working for a short time, a small amount of air pressure shall be given to prevent sediment from invading the interior of the percussion device of the drilling rig. If the drilling rig stops working for a long time, the percussion device shall be lifted 1-2m away from the hole bottom for fixation

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    50000000-100000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD.  is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD.  is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
  • https://www.waterwell-drillingrig.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement