Payment Terms | L/C, T/T |
Supply Ability | 15,000 KM/Year |
Delivery Time | 10 days |
Packaging Details | Wooden drum, iron wooden drum or as required |
Insulation Material | XLPE |
Phase cable | Aluminum |
Neutral cable | aluminum alloy |
Street lighting cable | Aluminum |
Standard | GB/T 12527-2008, IEC60502-1, NFC33209 |
structure | AAC/XLPE+NA AAAC/XLPE+AAC/XLPE |
Voltage | 0.6/1KV |
Port | Qingdao or Shanghai |
Brand Name | Zhenglan Cable |
Model Number | aerial bundled cable |
Certification | ISO 9001:2015,ISO 14001:2005; CCC |
Place of Origin | Henan, China |
View Detail Information
Explore similar products
Self Supporting System Overhead Insulated Cable Aluminum Conductor XLPE
Low Voltage 4 Awg Aluminum Wire Aerial Insulated Cable Temperature Resistant
XLPE Insulation Overhead Cable / 10KV Single Core use as overhead power lines
10kv Single Core Abc Xlpe Cable Aerial Insulation Line NFC33-209 Standard
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 15,000 KM/Year |
Delivery Time | 10 days | Packaging Details | Wooden drum, iron wooden drum or as required |
Insulation Material | XLPE | Phase cable | Aluminum |
Neutral cable | aluminum alloy | Street lighting cable | Aluminum |
Standard | GB/T 12527-2008, IEC60502-1, NFC33209 | structure | AAC/XLPE+NA AAAC/XLPE+AAC/XLPE |
Voltage | 0.6/1KV | Port | Qingdao or Shanghai |
Brand Name | Zhenglan Cable | Model Number | aerial bundled cable |
Certification | ISO 9001:2015,ISO 14001:2005; CCC | Place of Origin | Henan, China |
High Light | XLPE Insulated Aerial Bundled Cables ,1.1kv Aerial Bundled Cables ,NFC33-209 Multi Core Service Cable |
1.1kv XLPE Insulated Aerial Bundled Cables Multi-core Service Cable NFC33-209, TS HD 604 S1, GB/T 12706.1-2008IEC 60502
Application:
Aerial Bundled Cable is designed for residential and rural areas for reducing the bushfire hazards. Used primarily for overhead secondary distribution lines.The XLPE covering contains a high level of carbon black for UV resistance. It is designed for where reliability, safety and low installation cost are required, but it is only for short spans due to increased weight.
Conductor:
1. Aluminum Wire, 1350-H19 for Electrical Purposes.
2. Aluminum Conductors, Concentric-Lay-Stranded.
3. Aluminum Conductor, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
4. Concentric-Lay-Stranded 6201-T81 Conductors.
Insulation: PVC, XLPE, PE
Note: Insulation color as per standards or at request
Standards:
GB/T 12527-2008, IEC60502-1, IS:14255-1995, NFC33-209
Rated voltage: 0.6/1kV
Relative manufacturing standards: IEC61089, ASTM B231, ASTM B232, BS215, DIN48201, DIN48204.
We can also manufacture ABC cable according to customer's special requirements.
Below construction are also commonly used around the world.
A) Duplex Service Drop
Applications:To supply 120 volt aerial service for temporary service at construction sites,outdoor or street lighting . For service at 600 volts or lower at a conductor temperature of 75 maximum.
B) Triplex Service Drop
Applications: To supply power from the ulility`s lines to the consumer`s weatherhead. For service at 600 volts or less(phase to phase ) at a conductor temperature of 75 maximum for PE insulation or 90 maximum for XLPE insulation .
3 cores consisting of standard aluminium conductors, insulated with XLPE insulation
+ One sheath lighting aluminium conductor with XLPE insulation(optional)
+ One messenger Al-alloy conductor (bare or covered)
The messenger conductor can be of galvanised steel wire also.
The purpose of messenger wire is
A) It acts as load bearing wire.
B) It acts as earth or neutral conductor.
It meets or exceeds the following specifications:
C ) Quadruplex Service Drop
Applications: Used to supply 3 phase power , usually from a pole-mounted transformer to the use`s servic head where connection to the service entance cable is made . To be used at voltages of 600 volts or less phase to phase and at conductor temperature not to exceed 75 for PE insulated conductors or 90 for XLPE insulated conductors.
Parameters:
Code Word | 3×25mm2+1×54.6mm2 | 3×35mm2+1×54.6mm2 | 3×50mm2+1×54.6mm2 | 3×70mm2+1×54.6mm2 | 3×35mm2+1×54.6mm2+1×16mm2 | 3×70mm2+1×54.6mm2+1×16mm2 | 3×70+1×70mm2 | ||
Phase Conductor | Cross Section | (mm2) | 25 | 35 | 50 | 70 | 35 | 70 | 70 |
Insulation Thickness | (mm) | 1.4 | 1.6 | 1.6 | 1.8 | 1.6 | 1.8 | 1.8 | |
D.C.Resistance At 20 ℃ | (Ohm/km) | 1.2 | 0.868 | 0.641 | 0.443 | 0.868 | 0.443 | 0.443 | |
Messenger | Cross Section | (mm2) | 54.6 | 54.6 | 54.6 | 54.6 | 54.6 | 54.6 | 70 |
Insulation Thickness | (mm) | 1.6 | 1.6 | 1.6 | 1.6 | 1.6 | 1.6 | 1.5 | |
D.C.Resistance A 20 ℃ | (Ohm/km) | 0.63 | 0.63 | 0.63 | 0.63 | 0.63 | 0.63 | 0.5 | |
Minium Rated Strength | (daN) | 1660 | 1660 | 1660 | 1660 | 1660 | 1660 | 2050 | |
Public Lighting | Cross Section | (mm2) | - | - | - | - | 16 | 16 | - |
Insulation Thickness | (mm) | - | - | - | - | 1.2 | 1.2 | - | |
D.C.Resistance At 20 ℃ | (Ohm/km) | - | - | - | - | 1.91 | 1.91 | - | |
Conductor Diameter | Phase | Max | 6.3 | 7.3 | 8.4 | 10.2 | 7.3 | 10.2 | 10.2 |
Min | 5.8 | 6.8 | 7.9 | 9.7 | 6.8 | 9.7 | 9.7 | ||
Messenger | Max | - | - | - | - | 5.1 | 5.1 | - | |
Min | - | - | - | - | 4.6 | 4.6 | - | ||
Public Lighting | Max | - | - | - | - | 5.1 | 5.1 | - | |
Min | - | - | - | - | 4.6 | 4.6 | - | ||
Overall Diameter | Phase | Max | 9.4 | 10.9 | 12 | 14.2 | 10.9 | 14.2 | 14.2 |
Min | 8.6 | 10 | 11.1 | 13.3 | 10 | 13.3 | 13.3 | ||
Messenger | Max | 13 | 13 | 13 | 13 | 13 | 13 | 13.6 | |
Min | 12.3 | 12.3 | 12.3 | 12.3 | 12.3 | 12.3 | 12.9 | ||
Public Lighting | Max | - | - | - | - | 7.8 | 7.8 | - | |
Min | - | - | - | - | 7 | 7 | - |
Products images:
Why Choose Zhenglan Cable:
FAQ
Is your company a factory or a trade company?
Factory, more than 20 years in China
How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity. Usually it needs 7-30 days after get your payment.
What is your MOQ?
Generally it is 5000m.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
1996
Total Annual:
30000000-35000000
Employee Number:
300~349
Ecer Certification:
Verified Supplier
A Professional Manufacturer of Wires and Cables —Zhenglan Cable Technology Co. Ltd, formerly known as Henan Zhengzhou Cable Co. Ltd, is one of the largest scale backbone enterprises in China's wire and cable industry. Our company's registered capital is about $32 million an... A Professional Manufacturer of Wires and Cables —Zhenglan Cable Technology Co. Ltd, formerly known as Henan Zhengzhou Cable Co. Ltd, is one of the largest scale backbone enterprises in China's wire and cable industry. Our company's registered capital is about $32 million an...
Get in touch with us
Leave a Message, we will call you back quickly!