China factories

China factory - Jiangsu Zhonghai Bridge Equipment Co.,LTD

Jiangsu Zhonghai Bridge Equipment Co.,LTD

  • China,Zhenjiang ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m
China New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

  1. China New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

  1. MOQ: 1 Pcs
  2. Price: USD 95-450
  3. Get Latest Price
Payment Terms L/C,D/P,T/T
Supply Ability 60000ton/year
Delivery Time 8-10 work days
Packaging Details Naked
Application Bailey Bridge
Surface Galvanized
Name Bailey Bridge
Net Width 3.15m,3.6m,4.2m,7.35m,10.5m
Material Steel
Grade Q345-Q460C
Lane Single lane 3.15m~4.2m,Double Lane 7.35m
Surface Protection hot-dip galvanized
Brand Name Zhonghai Bailey Bridge
Model Number CB200/CB321
Certification IS09001, CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,D/P,T/T Supply Ability 60000ton/year
Delivery Time 8-10 work days Packaging Details Naked
Application Bailey Bridge Surface Galvanized
Name Bailey Bridge Net Width 3.15m,3.6m,4.2m,7.35m,10.5m
Material Steel Grade Q345-Q460C
Lane Single lane 3.15m~4.2m,Double Lane 7.35m Surface Protection hot-dip galvanized
Brand Name Zhonghai Bailey Bridge Model Number CB200/CB321
Certification IS09001, CE Place of Origin China
High Light new bailey bridgenew portable steel bridge7.35m bailey bridge

New Type Bailey Bridge/with Factory Price Ce Bailey Bridge


When building a 321-type Bailey bridge in mountainous areas, it is crucial to ensure that the bridge base is stable. Here are some specific methods and precautions:


1. **Foundation bearing capacity inspection**
- **Soil condition assessment**: Before building a Bailey bridge, the soil conditions at the bridge base must be assessed to ensure that the soil is solid. If the soil bearing pressure does not meet the design requirements, the foundation under the bridge base must be expanded or reinforced.
- **Angle of repose pile setting**: When the bank slope is steep (greater than the angle of repose), the position of the angle of repose pile must be calculated and set according to the formula.


2. **Foundation reinforcement method**
- **Enlarge the foundation**: If the soil conditions are not good, the bearing capacity can be increased by expanding the foundation area.
- **Concrete reinforcement**: Pour the concrete foundation at the bridge base to ensure that the foundation is deep into the stable stratum and provides sufficient support.
- **Pile foundation reinforcement**: When necessary, the method of driving pile foundation can be used to enhance the stability of the foundation.


3. **Bridge seat design and construction**
- **Bridge seat axle beam**: The bridge end column is supported on the bridge seat axle beam, which is divided into multiple sections. The appropriate bridge seat is selected according to the number of bridge rows.
- **Seat plate setting**: The seat plate should be set at the seat plate axis position, and the seat plate position should be properly excavated to reduce the bridge deck elevation, generally making the height difference between the bridge deck and the road surface no more than 30 cm.


4. **Precautions during construction**
- **Construction personnel safety**: Construction personnel must wear safety helmets and safety belts, and it is strictly forbidden to work on the rack after drinking. When using a crane to lift and remove Bailey piers, a special person should be assigned to direct the crane, and it is strictly forbidden for the crane boom to collide with the Bailey beam and its foundation.
- **Roller setting**: Rollers are set at the marked roller position, and a sample plate should be placed underneath. Only one row of trusses is allowed to pass through each rock, and the distance between the rock and the bearing plate is about 1.0 meter, and at least not less than 0.75 meter.

Through the above measures, the stability of the bridge base foundation can be ensured when building a Type 321 Bailey bridge in mountainous areas, thereby ensuring the safety and stability of the bridge.



Specifications:

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2

​​

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2014

  • Total Annual:

    20753202.90-27670940.00

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ... Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ...

+ Read More

Get in touch with us

  • Reach Us
  • Jiangsu Zhonghai Bridge Equipment Co.,LTD
  • No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
  • https://www.zhonghaibridge.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement